REGULATORY I4PRMATION DISTRIBUTION SYSW (RIDS)
ACCESSION NBR:8704300382 DOC.DATE: 87/04/28 NOTARIZED: NO DOCKET #
0ACIL:50-261 H.B. Robinson Plant, Uiit 2, Carolina Power & Light C 05000261 AUTH..NAME AUTHOR AFFILIATION VERRELLID.M.
Region 2, Office of Director RECIP.NAME RECIPIENT AFFILIATION UTLEYE.E.
Carolina Power & Light Co.
SUBJECT:
Advises that 80403 Rev 16 to radiological emergency plan consistent w/provisions of 10CFR50.54(b) & App E to 10CFtiO
& acceptable.
DISTRIBUTION CODE: IE35D COPIES RECEIVED:LTR ]- ENCL SIZE:_
TITLE: Emergency Preparedness-Appraisal/Confirmatory Action Ltr/Exercise Rep NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENGL ID CODE/NAME LTTR ENCL PD2-1 LA 1
PD2-1 PD 1
ECCLESTONK 1
INTERNAL: ARM/DAF/LFMB 1
0 NAR/DREP/EPB 3
NRR/PMAS/ILRB 1
02 1
S1GN2/DRSS/EPRPB 1
EXTERNAL: LPDR 1
NRC PDR 1
1 NSIC 1
TOTAL NUMBER OF COPIES REGUIRED: LTTR 14 ENCL
Carolina Power and Light Company APRO 3 9F Carolina Power and Light Company 4TTN:
Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
H. B. ROBINSON EMERGENCY PLAN REVIEW, REVISION 16 DOCKET NO. 50-261 We have completed our review of Revision 16 to the H. B. Robinson Radiological Emergency Plan, dated April 3, 1987.
Our review indicated that these changes to your Emergency Plan were consistent with the planning standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.
Please be reminded that 10 CFR 50.54(q) requires NRC approval of any changes to your Plan which may decrease the effectiveness of the Plan.
However, if your safety review indicated no decrease in the level of emergency preparedness, then changes can be made without NRC approval.
In all cases, you should furnish copies of each proposed change to the NRC in accordance with 10 CFR 50.54(q).
- Also, any changes to the Emergency Plan Implementing Procedures should be made in accordance with the requirements of 10 CFR 50, Appendix E, Section V.
Should you have any questions regarding this letter, please contact Mr. Thomas R. Decker of our staff at (404) 331-2559.
Sincerely, 87 4300382 8040023 David M. Verrelli, Chief FPDR Reactor Projects Branch 1 Division of Reactor Projects cc: g4 P. Beatty, Jr., Vice President Robinson Nuclear Project Dept.
P E. Morgan, Plant General Manager bcc: W&C Resident Inspector Document Control Desk State of North Carolina RI RIIR RI Ab aka TDec er DCollins P
edrickson 4/p /87 4/jY87 4/2ZI87 4/)V/87