November 4, 1986 Docket No.:
50-261 DISTRIBUTION Docket File J. Partlow Mr. E. E. Utley, Senior Executive NRC PDR N. Thompson Vice President Local PDR G. Requa Power Supply and Engineering PAD#2 Rdg D. Miller and Construction L. Rubenstein ACRS (10)
Carolina Power and Light Company OELD Tech Branch Post Office Box 1551 E. Jordan Gray File Raleigh, North Carolina 27602 B. Grimes G. Johnson
Dear Mr. Utley:
SUBJECT:
REQUEST FOR RELIEF FROM ASME SECTION XI REQUIREMENTS REGARDING INSERVICE INSPECTION OF SEAL WATER HEAT EXCHANGERS, PRESSURIZER NOZZLES AND VESSEL FLANGES: H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 (TAC NOS. 62075 & 62076)
By letters dated May 1, 1985 and April 22, 1986, pursuant to 10 CFR 50.55a, Paragraph g(5), you requested relief from certain requirements of Section XI of the ASME Boiler and Pressure Vessel Code (ASME Code) with regard to columetric examination requirements of Seal Water Heat Exchangers head-to-shell and shell-to-flange welds (#12); inner radii for the pressurizer nozzle (#13);
and shell-to-flange weld on the reactor pressure vessel (#14).
We have completed our review of your request. Based on our review, we have concluded that two relief requests Nos. 12 & 13 may be granted as requested and relief request #14 is denied. The enclosed Safety Evaluation provides the details and conclusions of our review.
For the reliefs that have been granted, we have determined that the ASME Code Section XI requirements are impractical and that the relief request is authorized by law and will not endanger life or property or the common defense and security and is otherwise in the public interest, giving due consideration to the burden upon the licensee that could result if the requirements were imposed on the facility.
The request for relief complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I.
Sincerely, Original Signed by Lester Rubenstein, Director PWR Project Directorate #2 Division of PWR Licensing-A
Enclosure:
Safety Evaluation Report cc:
See next page L
PM:PA6A D:
D r
GReq' LRub etein ehn 19 86 10 86 10/3/1 6
1W /86 8611070205 861104,
PDR ADOCK 05000261 E
Mr. E. E. Utley Carolina Power & Light Company H. B. Robinson 2 cc:
Thomas A. Baxter, Esquire Mr. Dayne H. Brown, Chief Shaw. Pittman, Potts and Trowbridge Radiation Protection Branch 2300 N Street, N.W.
Division of Facility Services Washington, DC 20037 Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008 Mr. McCuen Morrell, Chairman Darlington County Board of Supervisors Mr. Robert P. Gruber County Courthouse Executive Director Darlington, South Carolina 29535 Public Staff - NCUC P.O. Box 29520 Mr. H. A. Cole Raleigh, North Carolina 27626-0520 Special Deputy Attorney General State of North Carolina P.O. Box 629 Raleigh, North Carolina 27602 Mr. D. E. Hollar Associate General Counsel Carolina Power and Light Company P.O. Box 1551 Raleigh, North Carolina 27602 U.S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 413 Hartsville, South Carolina 29550 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30303 Mr. R. Morgan General Manager H. B. Robinson Steam Electric Plant Post Office Box 790 Hartsville, South Carolina 29550