ML14188B236

From kanterella
Jump to navigation Jump to search
Extends Invitation to Participate in 861016 Meeting in Bethesda,Md to Enhance Communications & Improve day-to-day Business Between Organizations.Proposed Agenda Encl
ML14188B236
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 09/18/1986
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Utley E
Carolina Power & Light Co
References
NUDOCS 8609250176
Download: ML14188B236 (3)


Text

Docket No. 50-261 DISTRIBUTION Docket File G. Requa NRC PDR D. Miller Local PDR ACRS (10)

Mr. E. E. Utley, Senior Executive Vice President PAD#2 Rdg Gray File Power Supply and Engineering and Construction T. Novak Carolina Power and Light Company OGC-Bethesda Post Office Box 1551.

E. Jordan Raleigh, North Carolina 27602 B. Grimes J. Partlow

Dear Mr. Utley:

N. Thompson, DHFT

Subject:

Revised Meeting Schedule This is an invitation to your operations and licensing management staff to participate in a meeting on October 16, 1986, with NRC management and Project Managers in PWR-A Project Directorate #2. The intent of this meeting is to enhance communications and improve day-to-day business between our organizations by discussing, in an informal atmosphere, topics of mutual interest relevant to licensing. I have enclosed for your review and comment a proposed agenda.

This agenda was developed based on informal conversations between our staffs in which topics of interest for the upcoming meeting was discussed. I welcome any suggestions you may have either for additional agenda items or for the meeting format.

The meeting has been scheduled at 9:00 a.m. on October 16, 1986, in Room P-114, Bethesda, Maryland. The meeting is expected to last all day. Please provide any suggestions or comments to Edward A. Reeves (301) 492-4782 or to me directly (301) 492-7872.

Sincerely, Lester S. Rubenstein, Director PWR Project Directorate #2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation

Enclosure:

As stated cc:

See next page L -

  1. 2 PM:PAD#?

PD:PAD#2 DM, ler GRepua LRubenstein 9/ 86 9/f /86 9// Q/86 8609250176 860918 PDR ADOCK 05000261 P

PDR

Mr. E. E. Utley Carolina Power & Light Company H. B. Robinson 2 cc:

Thomas A. Baxter, Esquire Mr. Dayne H. Brown, Chief Shaw, Pittman, Potts and Trowbridge Radiation Protection Branch 1800 M Street, N.W.

Division of Facility Services Washington, DC 20036 Department of Human Resources 701 Barbour Drive Raleigh, North Carolina 27603-2008 Mr. McCuen Morrell, Chairman Darlington County Board of Supervisors Mr. Robert P. Gruber County Courthouse Executive Director Darlington, South Carolina 29535 Public Staff - NCUC P.O. Box 29520 Mr. H. A. Cole Raleigh, North Carolina 27626-0520 Special Deputy Attorney General State of North Carolina P.O. Box 629 Raleigh, North Carolina 27602 Mr. D. E. Hollar Associate General Counsel Carolina Power and Light Company P.O. Box 1551 Raleigh, North Carolina 27602 U.S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 413 Hartsville, South Carolina 29550 Regional Administrator, Region IT U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30303 Mr. R. Morgan General Manager H. B. Robinson Steam Electric Plant Post Office Box 790 Hartsville, South Carolina

?9550

AGENDA FOR MEETING MEETING RETWEEN NRC PWR PROJECT DIRECTORATE #2 AND LICENSEES OF THREE LOOP WESTINGHOUSE PLANTS OCTOREP 16, 186 PHILLIPS RUILDING P-118 9:00 - q:30 INTRODUCTION o

Lester S. Rubenstein, Director, PD#2, Division of PWR Licensing-A, ONRR 0

Hugh L. Thompson, Jr., Director, Division of PWR Licensing-A, nNRP TECHNICAL UPDATE 9:30 -

1.0:00 Leak Before Break for 8OP Piping (Exemptions to GDC-4) - T. Sullivan 10:00 -

10:3n Operating Reactor Events Followup - M. Caruso 10:30 -

10:45 BREAK LEGAL CONSIDERATIONS 10:45 -

11:15 Sholly Process, Emergency Tech Specs, and 10 CFR 50.59 - L. Chandler 11:15 -

11:45 Fxemption Considerations 10 CFR 50.12(a) - F. Cameron 11:45 -

1:30 LUNCH RREAK INTEGRATF SCHEDULES 1:30 -

1:45 NRC Policy and Status - J. Lyons 1:45 -

2:30 Licensee Methods and/or Open Discussion -

Licensee Spokespersons 2:30 -

2:45 BREAK TECHNICAL SPECIFICATIONS 2:45 -

3:15 Current Standards - R. Perch 3:15 -

3:45 Improvement Program - E. Butcher CONCLUSION 3:45 -

4:00 Remarks - L. Rubenstein