Text
REQULA*Y INFORMATION DISTRIBUTIOWYSTEM (RIDS)
ACCESSION NBR:9605080121 DOC.DATE: 86/05/02 NOTARIZED: NO DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION ZIMMERMANS.R.
Carolina Power & Light Co.
RECIP.NAME RECIPIENT AFFILIATION RUBENSTEINL.S.
PWR Project Directorate 2
SUBJECT:
Forwards "HB Robinson Steam Electric Plant Unit 2 Inservice Insp. Testing Interval 2."
Submittal provides further justification for exemption requests denied in 85 223 SER &
includes addl requests for relief.
DISTRIBUTION m'DE: AO 7D C PIES RECEIVED: LTR I ENCL ;YSIZE:
3 TITLE: OR Su ittal:
Inservice Inspection/Testing NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PWR-A EB 1
1 PWR-A PD2 PD 01 5
5 REGUAG 1
1 INTERNAL: ADM/LFMB 1
0 ELD/HDS1 1
1 NRR PWR-A ADTS 1
1 NRR PWR-A EB 1
1 NRR PWR-B ADTS 1
1 NRR PWR-B EB 1
1 J
10/EIB 1
1 NRR/TAMB 1
1 RE 04 1
1 RGN2 1
1 EXTERNAL: 24X 1
1 LPDR 03 1
1 NRC PDR 02 1
1 NSIC 05 1
1 TOTAL UMBER-OF COPIES REGUIRED: LTTR 23 ENCL 21
CP&L Carolina Power & Light Company SERIAL: NLS-86-151 MAY 0 2 1986 Director of Nuclear Reactor Regulation Attention:
Mr. Lester S. Rubenstein, Director PWR Project Directorate #2 Division of PWR Licensing - A United States Nuclear Regulatory Commission Washington, DC 20555 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 DOCKET NO. 50-261/LICENSE NO. DPR-23 SUBMITTAL OF IN-SERVICE INSPECTION INTERVAL 2 TESTING PROGRAM
Dear Mr. Rubenstein:
Carolina Power & Light Company hereby resubmits our Interval 2 In-Service Inspection Test Program for pumps and valves. The present submittal provides further justification for exemption requests which were denied in the December 23, 1985 Safety Evaluation Report and includes additional requests for relief. The Company committed to provide this justification in a letter dated January 17, 1986. The entire program is resubmitted due to an internal procedure change which requires a changed format for such programs. Details of each major revision are included in the enclosed summary sheet.
Additionally, two sets of drawings in support of the program are included for your convenience.
Questions regarding this atter may be referred to Mr. Stephen D. Floyd at (919) 836-6901.
Yours very truly, S. < i mmerman Manager Nuclear Licensing Section JSK/pgp (3815JSK)
Enclosure cc:
Dr. 3. Nelson Grace (NRC-RII)
Mr. G. Requa (NRC) s as A r
Mr. H. E. P. Krug (NRC Resident Inspector - RNP) 8605080121 860502 e-)
PDR ADOCK 05000261 G
PDR 411 Fayetteville Street
- P. 0. Box 1551
- Raleigh. N. C. 27602
SUMMARY
SHEET SECTION ITEM REVISION EnLire ProgramReformatted as parL Of the Plant Operating Manual update.
Pump Relief Requests 5.2.1Relief request revised.
Pump Relief Requests 5.2.2 Pump Relief Requests 5.2.3 Relief request revised.
Pump Relief Requests 5.2.4 Relief request revised.
Pump Relief Requests 5.2.5 Relief request revised.
Pump Relief Requests 5.2.6 New relief request added for lubricant level observation.
Pump Relief Requests 5.2.7 New relief request added for Charging Pump Suction pressure measurement.
Pump Relief Requests 5.2.8 New relief request added for Component Cooling Water Pump flow ad differential pressure measurement.
Pump Relief Requests 5.2.9 New relief request for pump auction pressure measurement prior to and during operation.
Pump Relief Requests 5.2.10 New relief request for Residual Heat Removal Pump gauge range.
Valve Relief Request 5.3.1 Clarification added for Appendix J surveillance system.
Valve Relief Request 5.3.2 Clarification added for valve inspection on rotating frequency.
Valve Relie( Request 5.3.3
.Relief request revised.
Valve Relief Request 5.3.5 Alternate testing paragraph revised to report as found valve conditions.
Valve Relief Request 5.3.8 Clarification added for valve inspection on rotating frequency.
Valve Relief Request 5.3.9 Basis tor relief request revised to reflect completed modification.
Valve Relief Request 5.3.11 Basis fur relief request revised to reflect completed modification.
Valve Relief Request 5.3.12 Relief request revised.
Valve Relief Request 5.3.13 New relief request added for valves MS-263A, NS-2638, and MS-263C.
Valve Relief Request 5.3.14 New relief request added for valves SI-875AO SI-8756, and SI-875C.
Pump Test Program.1 TeSt procedure numbers revised to reflect recent Plant Operating Manual refurmdt.
New relief requests also referenced.
Valve Test Program.2 PlanL flow diagram sheet numbers and grid locations revised due to drawing update program. Test procedure numbers revised to reflect recent Plant Operaing Manual reformat.
Valve Test Program.4 SW-261 and SW-272 added to the program.
Page 1 of 5 Valve Test Program.4 SW54b, 547, 548, and 549 added to the program.
Page 2 of 5 Valve Test Program.4 TCV-1660 and TCV-1661 added to program.
Page 4 and 5 of 5 Relie:requst reised
SUMMARY
SHEET SECTION ITEM REVISION Valve Test Program.9 PP-296 deleted. PP-291A, PP-274D, and PP-275D added to the program.
Page 1 of 2 Valve Test Program.10 All IVSW system valves that are in the program are listed as B passive.
Valve Test Program.13 RV-707 categorized as passive based on a recent Plant modification and Page 1 of 3 removed from the program Valve Test Program.13 RV-791A categorized as passive and removed from the program.
Page 3 of 3 Valve Test Program.13 RV-791F and 791L added to the program.
Page 3 of 3 Valve Test Program.14 CVC-203A and 203B added to program.
CVC-203 deleted.
Page 1 of 5 Valve Test Program.1 4
CVC-2080,
- 2081, and 2082 added to the program.
Page 4 of 5 Valve Test Program.16 WD-1713 added to the program.
Page 1 of 2 Valve Test Program.16 WD-1966 added to the program.
Page 2 of 2 Valve Test Program.18 SI-868A,.868B, and 868C added to program as A passive.
Page 4 of 9 Valve Test Program.18 SI-894 deleted.
Page 8 of 9 Valve Test Program.20 RC-518 added to the program.
Page 1 of 3 Valve Test Program.21 VCT-13, 18, 19, 20, 21, and 23 added to the program.
Page 1 and 2 of 2 NRC: 86-1671(2)