ML14184A747

From kanterella
Jump to navigation Jump to search
Requests That Analysis of Liquid Samples Spiked W/ Radionuclides Be Completed as Soon as Practicable But No Later than 60 Days from Receipt of Samples
ML14184A747
Person / Time
Site: Robinson 
Issue date: 10/12/1990
From: Dan Collins
NRC/IE, NRC/RGN-II
To: Eury L
Carolina Power & Light Co
References
NUDOCS 9010240183
Download: ML14184A747 (3)


Text

OCT 12 1990 Carolina Power and Light Company ATTN:

Mr. Lynn W. Eury Executive Vice President Power Supply P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

DOCKET NO. 50-261 As part of the. NRC Confirmatory Measurements Program, liquid samples spiked with radionuclides will be sent to the H. B. Robinson facility fc.

radiochemical analyses. These samples are to be analyzed.for tritium, iron-55, strontium-89, and strontium-90 in accordance with your approved procedures for analysis of liquid waste samples.

If routine analyses of this type are normally performed by a vendor, this vendor should be used to analyze the spiked samples. The spiked samples, with instructions, will be sent under separate cover from the Department of Energy's Radiological and Environmental Sciences Laboratory, within approximately 30 days.

We request that the analyses be completed as soon as practicable, but no later than 60 days from receipt of the samples.

Results should be sent to:. U.S.

Nuclear Regulatory Commission, ATTN:

Mr. D. M. Collins. Our evaluation of your results will be discussed with your staff and transmitted in a letter.

Spiked samples will be, sent to you on an annual basis as part of our routine inspection program.

If you have any questions regarding this program, please contact Ms. Susan S. Adamovitz at 404-331-4774 or Mr. Thomas R. Decker at 404-331-2559.

Sincerely, ORIGINM SIGNED W DOUGLAS M COLL"S Douglas M. Collins, Chief Emergency Preparedness and Radiological Protection' Branch Division of Radiation Safety and Safeguards cc:

(See page 2).

901 0240183 90112 PDR XDOCK 000 C,.

PDC F,

Carolina Power and Light Company 2

cc:

C. R. Dietz, Manager Robinson Nuclear Project Department H. B. Robinson Steam Electric Plant P. 0. Box 790 Hartsville, SC 29550 R. E. Morgan, Plant General Manager H. B. Robinson Steam Electric Plant P. 0. Box 790 Hartsville, SC 29550 Dayne H. Brown, Director Division of Radiation Protection N. C. Department of Environment, Health & Natural Resources P. 0. Box 27687 Raleigh, NC 27611-7687 McCuen Morrell, Chairman Darlington County Board of Supervisors County Courthouse Darlington, SC 29535 Richard E. Jones, General Counsel Carolina Power and Light Company P. 0. Box 1551 Raleigh, NC 27602 H. A. Cole Special Deputy Attorney General State of North Carolina P. 0. Box 629 Raleigh, NC 27602 Avery Upchurch, Chairman Triangle J Council of Governments 100 Park Drive P. 0. Box 12276 Research Triangle Park, NC 27709 Robert Gruber Executive Director Public -Staff -

NCUC P. 0. Box 29520.

Raleigh, NC 27626-0520 J. Eaddy, Jr.

Supervisor, Environmental and Chemistry P. 0. Box 790 Hartsville, SC 29550 bcc:

(See page 3)

Carolina Power and Light Company 3

bcc:

Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission.

Route 5, Box 413 Hartsville, SC 29550 "RII:DRSS RIDRSS RIl: RP n

]peTDecker H ce

/7/ft /90

/// /90

/f0