ML14184A484
| ML14184A484 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 08/31/1983 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14184A485 | List: |
| References | |
| NUDOCS 8309260606 | |
| Download: ML14184A484 (3) | |
Text
Di sv-bution August 31, 1983 cDo ktm.
ORAB NRC PDR C. Parrish Local PDR T. Barhhart (4)
ORB#l Rdg.
OPA, C. Miles D Eisenhut SECY w/trans form Docket No. 50-261 OELD R. Diggs E Jordan G Requa NSIC J Taylor Mr. E. E. Utley, Executive Vice President ACRS (10)
Power Supply and Engineering & Construction Carolina Power and Light Company 336 Fayetteville Street Raleigh, North Carolina 27602
Dear Mr. Utley:
By letter dated August 5, 1977, as revised October 25, 1978 and March 22, and September 17, 1982, you submitted a proposed inservice inspection program description and request for relief from inspection requirements pursuant to 10 CFR 50.55a(g). The purpose of.this letter is to inform you of the results of the staff review of your relief requests and to grant relief in part from the requirements of Section XI of the American Society of Mechanical EngineersBoiler and Pressure Vessel Code (the Code) or impose other requirements, as appropriate.
The review of requests for relief from the inservice inspection requirements has been completed. Based on the results of this review, the staff has determined there are cases in which the requests relief cannot be granted, and cases where relief can be granted as indicated in the tables contained in the enclosed Safety Evaluation.
Section 50.55a(g) of 10 CFR Part 50 requires that your program be revised at 120-month intervals with the start of commercial operation being the reference date. The start of the next interval for your facility is March 7, 1991 and your inservice inspection and testing program must be based on the edition and addenda of the Code incorporated by 10 CFR 50.55a(g) 12 months prior to that date. Any changes to your Technical Specifications are required to be submitted at least six months prior to the beginning of a 120-month interval and it is requested that any requests for relief from Code requirements be provided on the same schedule. The staff review of your relief requests for your next interval will be conducted on a schedule based on the program-revision requirements for your facility. Until that time you should follow the inservice inspection program proposed by your letters dated March 22 and September 17, 1982, modified as described herein and by any further relief granted or additional testing imposed during the remainder of the period. Any relief from Code requirements granted herein expires on March 7, 1991.
The enclosed Safety Evaluation (Enclosure 1) delineates those items for which relief has been granted and alternate schedules and procedures defined. The staff has determined that where stated the Code requirements are impractical, OFFICE) 05000;6 SURNAME DATE NRC FORM 318 (10-80) NACM 0240 OFFICIAL RECORD COPY USGPO: 1981-335-960
-2 the granting of this relief is authorized by law and will not endanger life or porperty or the common defense and security, and is otherwise in the public interest considering the burden that could result if they were imposed on your facility.
A copy of the related Notice of Granting of Relief is enclosed.
Sincerely, Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing
Enclosures:
- 2. Notice of Relief for FRN D TRIBUTI Do ket Fi e NRC PDR Loca PD P ORB eadiSa D. Eis hut OELD E. Jo d n Proj ct anager-G.Requa NSI J. aylor AC S (10)
\\%IY C 0 R.
.1..
B..........................
SURNAME C
- g.
Rey,...
........ P
.T5.
..s.,.
Lan....
DATEb8!
- 2.
8/$ /8i 3
DAT FOR 318
...R.
.....0...240
.OFFICIA RE.
1831..-...
NRC FORM 318 (10-80) NRCM 0240 OFFIC IA L RE CORDCO PY USGPO: 1981-335-960
Mr. E. E. Utley Carolina Power and Light Company cc: G. F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, D. C. 20036 Regional Radiation Representatives EPA Region IV 345 Courtland Street, N.E.
Atlanta, Georgia 30308 Mr. McCuen Morrell, Chairman Darlington County Board of Supervisors County Courthouse Darlington, South Carolina 29535 State Clearinghouse Division of Policy Development 116 West Jones Street Raleigh, North Carolina 27603 Attorney General Department of Justice Justice Building Raleigh, North Carolina 27602 U. S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 266-1A Hartsville, South Carolina 29550 James P. O'Reilly Regional Administrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street Atlanta, Georgia 30303 Mr. R. B. Starkey, Jr.
General Manager H. B. Robinson Steam Electric Plant P. 0. Box 790 Hartsville, South Carolina 29550