ML14184A439

From kanterella
Jump to navigation Jump to search
Confirms 830208 Telcon Re NRC Approval of Request for 24 H Extension to Maint Period,Per Tech Spec 3.3.7.Extension Allows Plant to Remain in Power Operation Mode While Repairs Completed on Svc Water Booster Pump B
ML14184A439
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/11/1983
From: O'Reilly J
NRC/IE, NRC/RGN-II
To: Utley E
Carolina Power & Light Co
References
NUDOCS 8307140207
Download: ML14184A439 (1)


Text

  • pOFFICIA 9ECORD COPY FEB 111983 m

rao Carolina Power and Light Company ATTN:

Mr. E. E. Utley Executive Vice President 411 Fayetteville Street Raleigh, NC 27602 Gentlemen:

SUBJECT:

APPROVAL OF EXTENDED MAINTENANCE REQUEST FOR H. B. ROBINSON DN: 50-261 This letter confirms the telephone discussion of February 8, 1983, between Mr. S. R. Zimmerman, Manager of Licensing and Permits, and Mr. R. C. Lewis of this office, in which, after consultation with NRR, we concurred with your request of a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> extension to the maintenance period in accordance with Technical Specification 3.3.7. The extension permitted the plant to remain in a power operation mode while repairs to the "B" Service Water Booster Pump were completed.

Should you have any questions concerning this letter, please contact this office.

Sincerely, James P. O'Reilly Regional Administrator cc:

R. B. Starkey, Jr., Plant General Manager bcc:

H. R. Denton, NRR S. A. Varga, NRR NRC Resident Inspector Document Management Branch State of South Carolina RII RII RII RII CWHehl:caw PRBemis DMVerrelli RCLewis 2/I//83 2//,/83 2 p/

2/)o/ 83 8307140207 830211 PDR ADOCK 05000261 i

p PD 2