DISTRIBUTION Docket
~E.BoT
~NRC PDR FED 0 7 198NC D
L PDR NSIC ORB#1 Rdg Docket No. 50-261 DEisenhut OELD JMTaylor ELJordan Mr. E. E. Utley, Executive Vice President ACRS-10 Power Supply and Engineering & Construction CParrish Carolina Power and Light Company GRequa Post Office Box 1551 Gray Raleigh, North Carolina 27602
Dear Mr. Utley:
SUBJECT:
AUDIT OF PROCEDURES AND TRAINING FOR PRESSURIZED THERMAL SHOCK H. B. ROBINSON STEAM ELECTRIC PLANT UNIT NO. 2 We have reviewed your May 4, 1982 response to the NRC audit ofrprocedures and training for pressurized thermal shock (PTS) that was conducted Arpil 5-7, 1982 at the H. B. Robinson Si6am Electric Plant, Unit No. 2.
This audit was conducted to assure the NRC staff that the plant operators had sufficient knowledge of PTS concerns and mitigating actions to deal with a PTS event should one occur.
Based on our review, we conclude that you have met the objectives of the PTS audit and no further action will be required based on that audit.
Sincerely, Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing cc: See next page 4 302604 8.8 02 PDR ADOCK 05000261 P
PDR ORB#1-:D ORB#1.
OFFICE)
SURNAME DATE NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY usao-1981-33&-9W0
Mr. E. E. Utley Carolina Power and Light Company cc: G. F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.
Washington, D. C. 20036 U. S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 266-1A Hartsville, South Carolina 29550 James P. O'Reilly Regional Administrator -
Region II U. S. Nuclear Regulatory Commission 101 Marietta Street - Suite 3100 Atlanta, Georgia 30303