ML14184A248

From kanterella
Jump to navigation Jump to search
Requests Util Provide Rept Documenting Relief & Safety Valve Failures for Apr 1980 to Present & Commitment to Rept All Failures Promptly & All Challenges Periodically.Info Needed to Complete Review of TMI Item II.K.3.3
ML14184A248
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/07/1982
From: Varga S
Office of Nuclear Reactor Regulation
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
References
TASK-2.K.3.03, TASK-TM NUDOCS 8208020438
Download: ML14184A248 (2)


Text

-NRC' PR Local PDR JUL 0 7 1982 ORB#l Rdg D. Eisenhut C. Parrish G. Requa OELD I&E (1)

Docket No. 50-261 NSIC ACRS (10)

Mr. J. A. Jones Carolina Power and Light Company 336 Fayetteville Street Raleigh, North Carolina 27602

Dear Mr. Jones:

Re:

TMI Action Plan Item II.K.3.3, Reporting Relief Valve and Safety Valve Failures and Challenges We have reviewed the status of implementation of the above TMI Action Item for H. B. Robinson, Unit No. 2. This action item requires that you comhit to making prompt reports on all PORV and safety 1-ve failures at Unit 2 and document all challenges.

During telephone communications you stated that you document all challenges in your annual report, however we have no record that you made a commitment to making prompt reports on all PORV and safety valve failures and document all challenges.

In order to close out this issue for both units it is requested that you provide the following documentation:

a) A report documenting relief valve and safety valve failures and challenges for the period April 1, 1980 to present.

b) A commitment to (1) promptly report to the NRC any future failures of relief valves or safety valves at Unit 1 and (2) periodically report to the NRC all challenges in the future of relief valves or safety valves.

It is planned that tfese reporting requirements will be formalized administratively in your Technical Specifications. We will contact you in the future regarding this.

This request for information was approved by the Office of Management and Budget under clearance number 3150-0065 which expires May 31, 1983.

Sincerely, o'riginal signed bya iS. A. Varga 08020438 820707 Steven A. Varga, Chief P

PDR Operating Reactors Branch #1 Division of Licensing B.#1 DL:ORB#1

. RB 1 OFFICE)

SURAME

.GRequa:

r T.Colburn

.Va SURNAME).....

T......

A.. 1j82 7....

j

?........

2 NRC FORM 318 (10-80) NRCM 0240 FICIAL RECORD COPY USwPO:1981-335-960

Mr. J. A. Jones Carolina Power and Light Company cc:

G. F. Trowbridge, Esquire Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, D. C. 20036 Hartsville Memorial Library Home and Fifth Avenues Hartsville, South Carolina 29550 U. S. Nuclear Regulatory Commission Resident Inspector's Office H. B. Robinson Steam Electric Plant Route 5, Box 266-lA Hartsville, South Carolina 29550 Alan S. Rosenthal, Chairman Atomic Safety and Licensing Appeal Board Panel U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Richard S. Salzman Atomic Safety and Licensing Appeal Board Panel U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Dr. W. Reed Johnson Atomic Safety and Licensing Appeal Board Panel U. S. Nuclear Regulatory Commission Washington, D. C. 20555 James P. O'Reilly Regional Administrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303