ML14183A439

From kanterella
Jump to navigation Jump to search
Forwards Exam Rept 50-261/OL-88-01 of Makeup Simulator Exam Administered on 880523.Simulation Facility Fidelity Rept Also Encl
ML14183A439
Person / Time
Site: Robinson 
Issue date: 06/27/1988
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML14183A440 List:
References
NUDOCS 8807080052
Download: ML14183A439 (3)


Text

ACCELERATED DIS JR1BUTION DEMONSTATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8807080052 DOC.DATE: 88/06/27 NOTARIZED: NO DOCKET #

FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION JULIAN,C.A.

Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION UTLEY,E.E.

Carolina Power & Light Co.

SUBJECT:

Forwards Exam Rept 50-261/OL-88-01 administered on 880523.

DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Operator Licensing Examination Reports NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1

1 LO,R 1

1 INTERNAL: AEOD/DSP/TPAB 1

1 NRR MORISSEAU,D 1

1 NRR/DLPQ/HFB 10 1

1-NRR/DLPQ/OLB 10 2

2 NUDOCS-ABSTRACT 1

1 REGIFTRE 02 1

1 RGN2 FILE 01 1

1 EXTERNAL:

LPDR 1

1 NRC PDR 1

1 NSIC 1

1 I

TOTA NUBER F CPTE REOTRE: LTR 1

ENL 1

June 27, 1988 Carolina Power and Light Company ATTN:

Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

H. B. ROBINSON EXAMINATION REPORT 261/OL-88-01 The NRC administered a makeup simulator examination on May 23, 1988 to one employee of your company who had applied for a license to operate the H. B.

Robinson Nuclear Plant. At the conclusion of the site visit, preliminary findings on the operating test were discussed with those members of your staff identified in the Examination Report, Enclosure 1. summarizes simulator performance deficiencies observed during conduct of the simulator portion of the operating examinations.

In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (ORIGINAL SIGNED BY G. A. BELISLE FOR)

Caudle A. Julian, Chief Operations Branch Division of Reactor Safety

Enclosures:

1. Exam Report 50-261/OL-88-01
2. Simulation Facility Fidelity Report cc w/encl 1:

J. L. Harness, Corporate Training Dir.

R. E. Morgan, Plant Manager cc w/encls 1 & 2:

C. Bethea, Training Director bcc:

(See Page 2) 8807080052 880627 PDR ADOCK 05000261 V

PDC

Carolina Power and Light Co.

June 27, 1988 bcc w/encl 1:

R. Lo, Project Manager, NRR P. Fredrickson, Section Chief, DRP M. Ernstes, OL Examiner, DRS State of South Carolina bcc w/encls 1 & 2:

Senior Resident Inspector Operator Licensing Branch, DLPQ:NRR LAc-Rument Control Desk RII RN PRShaw:obw CPayne KEBrdcYman CAJulian 06//1/88 06/1c/88 06/ /rA88 06/ >/88