ACCELERATED DISIOBUTION DEMONSTRA40N SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8803250162 DOC.DATE: 88/03/14 NOTARIZED: NO DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261 AUTH.NAME AUTHOR AFFILIATION JULIAN,C.A.
Region 2, Ofc of the Director RECIP.NAME RECIPIENT AFFILIATION UTLEY,E.E.
Carolina Power & Light Co.
SUBJECT:
Forwards replacement Exam Rept 50-261/OL-87-02 administered on 871215.
R DISTRIBUTION CODE: IE42D COPIES RECEIVED:LTR._ /ENCL SIZE: Lz TITLE: Operator Licensing Examination Reports NOTES:
D RECIPIENT COPIES RECIPIENT COPIES S
ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1
1 LO,R 1
1 INTERNAL: AEOD/DSP/TPAB 1
1 NRR MORISSEAU,D 1
1 A
,RjD)LPQ/HFB10D 1
1 NRR/DLPQ/OLB10D 2
2 REG 02 1
1 RGN2 FILE 01 1
1 1
EXTERNAL: LPDR 1
1 NRC PDR 1
1 D
NSIC 1
1 S
IR D
S A
D D
S TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 12
March 14, 1988 Carolina Power and Light Company ATTN:
Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. 0. Box 1551 Raleigh, NC 27602 Gentlemen:
SUBJECT:
REPLACEMENT EXAMINATION REPORT - H. B. ROBINSON STEAM ELECTRIC PLANT 261/OL-87-02 The NRC administered examinations on December 15, 1987, to employees of your company who had applied for licenses to operate the H. B. Robinson Steam Electric Plant. At the conclusion of the written examination, a copy of the exam was left with your staff; at the conclusion of the site visit, preliminary findings on the operating tests were discussed with those members of your staff identified in the Examination Report, Enclosure 1.
Copies of the written examination questions and answer key are included in this report as Enclosure 2. Facility comments regarding the written examination are included in this report as Enclosure 3. The Simulation Facility Fidelity Report is included in this report as Enclosure 4.
In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in NRC's Public Document Room.
Should you have any questions concerning this letter, please contact Ken Brockman at 404/331-5594 or Jesse Arildsen at 404/331-5562.
Sincerely, (ORIGINAL SIGNED BY M. B. SHYMLOCK FOR )
Caudle A. Julian, Chief Operations Branch Division of Reactor Safety
Enclosures:
- 1. Exam Report 50-261/OL-87-02
- 2. SRO Exam Questions & Answer Key
- 3. Facility Comments
- 4. Simulation Facility Fidelity Report cc w/encls:
(See page 2) 880:3250162 -80314 PDR DOCK 05000261 V
Carolina Power and Light Company 2
March 14, 1988 cc w/encls 1 & 3:
J. L. Harness, Corporate Training Dir.
R. E. Morgan, Plant Manager cc w/encls 1, 2, 3 & 4:
C. Bethea, Site Training Director bcc w/encl 1:
G. Requa, Project Manager, NRR P. Fredrickson, Section Chief, DRP J. Ar-ildsen, OL Examiner, DRS State.of South Carolina bcc w/encls 1, 2 3 & 4:
Senior Resident Inspector Operator Licensing Branch, DLPQ:NRR A-9Gcument Control Desk EG&G, Contractor RII RH RII RI PRShaw:tm J ildsen KBrockman CAJulia 02/ /88 92'/ /88 1
//