ML14183A148

From kanterella
Jump to navigation Jump to search
Amend 124 to License DPR-23,changing Certain Requirements on Storage of Diesel Fuel Oil Inventory Onsite & Associated Surveillance Requirements for Sampling & Testing
ML14183A148
Person / Time
Site: Robinson 
Issue date: 10/26/1989
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML14183A149 List:
References
DPR-23-A-124 NUDOCS 8911090286
Download: ML14183A148 (10)


Text

PtRE00u UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 CAROLINA POWER & LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 124 License No.

DPR-23

1. The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Carolina Power & Light Company (the licensee), dated November 30, 1988, and supplemented on May 5, 1989, and October 11, 1989, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conductea in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 3.B of Facility Operating License No. DPR-23 is hereby amended to read as follows:

6911090286 891026 PDR ADOCIL 05000261

'P PNU

(B) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 124, are hereby incorporated in the license. Carolina Power & Light Company shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION Edward A. Reeves/for Elinor G. Adensam, Director Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

October 26, 1989

  • See letter concurrences OFC
LA:PD R:PM:PD21:PRPR: OGC*
D:P I DRSgLB

- T (

SELB*

NAME : PA'7:

RLo

CBarth
EAdensam Rosa DATE &/89

.I3/

89

6/13/89 A"O/D/f89
6/9/89 OFFICIAL RECORD COPY

ATTACHMENT TO LICENSE AMENDMENT NO. 124 FACILITY OPERATING LICENSE NO. DPR-23 DOCKET NO. 50-261 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised areas are indicated by marginal lines.

Remove Pages Insert Pages 3.7-1 3.7-1 3.7-4 3.7-4 3.7-4a 4.1-10a 4.6-2 4.6-2 4.6-2a 4.6-4 4.6-4

3.7 AUXILIARY ELECTRICAL SYSTEMS A ppli c a D L v

Applies co :he avaiLabiLity of electrical power for the operation of pLanc auxiL:ares Objeccie Co define chose condicions of electrical power availability necessary (1) to provide for safe reactor operacion, and (2) to provide for the continuing availabilicy of engineered safeguards.

Soecification 3.7.1 The reactor shall not be maintained critical without:

a.

The 110 KV-4160 Volt start-up transformer in service;

b.

4 80-Volt buses El and E2 energized;

c.

4 160-VoLt buses 2 and 3 energized; Two diesel generators OPERABLE with a minimum supply of 19,000 gallons of fuel oil available to the diesel generators from the Unit 2 diesel generator fuel oil storage tank and an additional 15,000 gallons available :o the dieseL generators from either the Unit 1 I-C turbine fueL oil storage canks or a combination of the Unit 1 I-C turbine fuel oil storage tanks and the Unit 2 diesel generator fuel oil storage cank, and With :he following protective trips for each dieseL generacor bypassed:

i)

Low Lube oil pressure

)

Low coolant pressure

3)

High cooLant cemperacure

4)

High crankcase pressure

5)

Start -aLure trip of fuel racks 3.7-1 Amendment No. 124

Two diesel rators have sufficient capacity Start and ra at design load all of the engineered safety features equipment.

The safety features operated free one diesel generator can adequately cool the core for a4y Lose-of-Coolact incident, and they also maintain the containment pressure within the design value.

The msrm:Lese; in;eL oil' :.nvencory available :D the diese

ener-t:::,s :nt
ae Un.c-zieseL zeneracor fuel oil scorage :ank (Unic 2 tank).s naLuaLned at al
.1!es co assure :ne operation of either

) both dieseL genera:ors ac raced design capac tiy for a: least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />(1, or 2) one dieseL generator ac rated design capacity for at Least 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />.

DieseL fueL is also availaoLe to the Unic 2 tank from four Jnic I :-C turbine fueL oil storage :anKs (Jni: I canks).

This additional storage is comprised of three :-C turbine fuel oil storage canks ac approximacely 23.900 gallons capacity each, and one r-C

urbine vertical light-off fuel oil storage :ank ac approximacely 23,900 gallons capacity, for a cotal Unit I fuel oil storage capacicy of approximately 95,600 gallons.

(The Unit I 7-C turbine horizontal Light-off fuel oil storage tank capacicy is not available to the Unit 2 tank.)

Connections are provided for fuel oil transfer from the four Unit ' canks to

.he Unit 2 tank. Therefore, the minimum diesel fuel oil inventory available to the diesel generators from the total on-site diesel fuel oil storage capacity is maintained at all times to assure :he operation of one diesel generator at its rated design capacity for seven days.

"Rated design caoacty" for this specification is defined as operation at 2500 kW for 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> and 2750 kW for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in any 24-hour period.

Additi:nal supplies of diesel oil are avaiLable in the Hartsville area and

rom por: :erminals at Charleston, S.C.

and Wilmington, N.C., and inland terninals at Columbia, S.C., Charlotte, N.C., Greensboro. N.C.. Layetteville, and Raleigh, N.C.

Ample trucking :act.':Les exist to assure deliveries

o :-e si:e wi:hin eight hours.

One :ac:ery charger snatl be in service so that,he battertes L.I.

alvays be ac tuiL charge in anticipaction of loss-of-A.C. power inctoenc.

his ensures
hac adequate D.C. power will be available for emergency uses.

3.7-4 Amendment No. 80, 124

The pLant can be safetv shut down ithouc The use of offsice power since aLL

.;al Loads (safet*, svscems. Enscr:mencs. ecc.) can De suppLied from Che emergen2cy dieseL generacors.

-he >o dieset generacors, each capabLe of suppLying safeguards Loads, and che scar:-up cransiormer provide Three secarace sources of power ;mmediaceLy avaiLabLe for operation of These loads.

3. 7-4a Amendment 4o. 124

Table 4.1-2 (Continued)

Frequencies For Sampling Tests Maximum Time Check Freque y Between Tests

11. U-2 Diesel Generator API or Specific Monthly 45 Days Fuel Oil Storage Gravity, Water Tank and Sediment, Viscosity
12. U-1 I-C Turbine API or Specific Prior to N/

Fuel Oil Storage Gravity, Water transfer to A

Tanks or Tank and Sediment, U-2 Truck Viscosity 4.1-10a Amendment No. 124

bypasses Listed in Specification 3.7.1.d shall be demonstrated to be operable by simuLatIng a trip signal to each of the triD devices chat is bypassed and observing that the diesel does not 4.6.1.3 Each dieseL generator shall be inspected at eaca refueLing.

4.6.1.4 Diesel generator eleccric Loads shall not be increased beyond the Long term rating of 2500 kW.

4.6.2 Diesel Fuel Tanks A minimum fuel oil invencory sufficient to ensure 19,000 gallons available to the diesel generators shall be maintained at all times in the Unit 2 diesel generator fuel oil storage tank and an additional 15,000 gallons available to the diesel generators shall be maintained at all times in either the Unit 1 I-C turbine fuel oil storage tanks or a combination of the Unit 1 I-C turbine fuel oil storage tanks and the Unit 2 diesel generator fuel oil storage tank.

4.6.3 Station Batteries 4.6.3.1 The voltage and temperature of a pilot cell in each battery shall be measured and recorded daily, 5 days/week.

4.6.3.2 The specific gravity and voltage to the nearest O.J volt, the temperature reading of every fifth cell, the height of electrolyte and the amount of water added to each cell shall be measured and recorded monthly.

4.6.3.3 Each battery shall be subjected to an equalizing charge annuaill.

The requirements in 4.6.3.2 above shall be performed after each equalizing charge.

Amendment No.,J24

4.6.3.4 At each time data is recorded, new data shall be compared with old to detect signs of aouse or deterioration.

4.6-2a Amendment No. 124

Each unic as a backup to the normal scandby AC power suppLy is capable of sequentially scarcing and supplying the power requiremenc 3t one complete sec o.

sarety features equipment.

It can acceo:

L-ciad ichin 35 seconds after the iral scarcing signaL.

n=

sequentially scart and suppLy the power requirements or ne comolete sec e sarecy reacures equipmenc in 50 seconds.(2)

A supply of 19,000 gallons of fuel will ensure the ooerack:n of boct diesels carrying rated design capacity for ac Least 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or cne diesel for at Leasc 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />.

An additional 15.000 gallons wiLl be available to assure an adequate fuel supply tor at Least seven days of operation of a single diesel generator ac its raced design capacity.

Rated design capacity for Chis specificacion is defined as operation at 2500 kW for 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> and ac 2750 k4 for two hours in any 24-hour period.

Station batteries will deteriorate with time, but precipitous failure is extremely unlikely. The surveillance specified is chac which has been demonstrated over the years to provide an indication of a cell becoming unserviceable Long before it fails.

The equalizing charge, as recommended by the manuEaccurer, is vical to maintaining the ampere-hour capability of the battery.

As a check upon the effectiveness of the equalizing charge the battery shouLd be Loaded rather heavily and the voltage monitored as a function of time.

Experience has shown chat this tesc should be repeated at ntervals to detect deterioration of cells.(3)

If a ceLL has deteriorated or if a connection is Loose, the voltage under Loaa will crop excessively indicating ralacement or = :a enance.

refrences (1) 7SAR Section 3.2 (2) ESAR Table 8.2-4 (3) AEC Information Leccer ROE:

57-1. January 31. 1967.

Amendment No.

124