ML14183A047

From kanterella
Jump to navigation Jump to search
Amend 100 to License DPR-23,adding Provision to Tech Specs to Allow Shift Complement & Fire Brigade to Be One Less than Min Requirement for Period Not to Exceed 2 H
ML14183A047
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/29/1986
From: Rubenstein L
Office of Nuclear Reactor Regulation
To:
Shared Package
ML14183A048 List:
References
NUDOCS 8608150332
Download: ML14183A047 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 CAPOLINA POWER AND LIGHT COMPANY DOCKET NO. 50-261 H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 100 License No. DPR-23

1. The Nuclear Regulatory Commission (the Commission) has found that:

A. The application for amendment by Carolina Power and Light Company (the licensee) dated August 28, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2. Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph,3.B of Facility Operating License No. DPR-23 is hereby amended to read as follows:

8608150332 660729 PDR ADOCK 05000264 P

PDR

-2 (B) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 100, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3. This license amendment is effective as of the date of its issuance.

FOR TNE NUCLEA GULATORY COMMISSION Lester S. Rubenstein, Director PWR Project Directorate #2 Division of PWR Licensing-A

Attachment:

Changes to the Technical Specifications Date of Issuance:

July 29, 1986

ATTACHMENT TO LICENSE AMENDMENT

  • AMENDMENT NO.

100 FACILITY OPEPATING LICENSE NO. DPR-23 DOCKET NO. 50-261 Revise Appendix A as follows:

Remove Pages Insert Pages 6.2-2 6.2-2

(HBR-26)

d.

At least two licensed operators shall be present in the control room during reactor start-up, scheduled reactor shutdown, and during recover'y from reactor trips.

e.

An individual qualified in radiation protection procedures shall be on site when fuel is in the reactor.

f.

ALL CORE ALTERATIONS after the initial fuel loading shall be directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator limited to fuel handling who has no other concurrent responsibilities during this operation.

g.

A plant fire brigade of at least five members shall be maintained on site at all times. This excludes three members of the minimum shift crew necessary for safe shutdown of the plant and any personnel required for other essential functions during a fire emergency.

h.

The shift complement-may be one less than the minimum requirement of Section 6.2.3.a and 6.2.3.b for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accommodate unexpected absence of on-duty shift members provided immediate action is taken to restore the shift complement to within the minimum requirements of Section 6.2.3.a and 6.2.3.b. This provision does not permit any shift member position to be unmanned upon shift change due to an oncoming shift member being late or absent.

Fire brigade may be one less than the minimum requirement of Section 6.2.3.g for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to accommodate unexpected absence, provided immediate action is taken to fill the required positions.

6.2-2 Amendment No. 84. 100