REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9801210298
DOC.DATE: 97/12/22
NOTARIZED: NO
DOCKET #
FACIL:50-261.H.B. Robinson Plant, Unit 2, Carolina Power & Light C
05000261
AUTH.NAME
AUTHOR AFFILIATION
SHYMLOCK,M.B.
Region 2 (Post 820201)
RECIP.NAME
RECIPIENT AFFILIATION
KEENAN,J.S.
Carolina Power & Light Co.
SUBJECT: Forwards insp rept 50-261/97-12 on 971012-1122 & notice of
violation.Violations involves failure to adequately control
post mod testing related to containment air recirculation
cooling system.
DISTRIBUTION CODE: IE01T
COPIES RECEIVED:LTR
ENCL
SIZE:
f7
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
(
PD2-1 PD
1
1
SHEA,J W
1
1
INTERNAL: AEOD/SPD/RAB
1
1
1
1
DEDRO
1
1
Q
1
1
NRR/DRCH/HHFB
1
1
NRRDZIPECB
1
1
NRR/DRPM/PERB
1
1
NUDOCS-ABSTRACT
1
1
OE DIR
1
1
OGC/HDS3
1
1
RGN2
FILE
01
1
1
ERNAL: LITCO BRYCE,J H
1
1
NOAC
1
1
NRC PDR
1
1
NUDOCS FULLTEXT
1
1
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIS'
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION,
CONTACT THE DOCUMENT CONTR{
DESK
(DCD)
ON EXTENSION 415-2083
FULL TEXT CONVERSION REQUIRED
TOTAL NUMBER OF COPIES REQUIRED: LTTR
17
ENCL
17
December 22, 1997
Carolina Power & Light Company
ATTN:
Mr. J. S. Keenan
Vice President
H. B. Robinson Steam Electric Plant
Unit 2
3581 West Entrance Road
Hartsville, SC 29550
SUBJECT:
NRC INTEGRATED INSPECTION REPORT NO. 50-261/97-12
Dear Mr. Keenan:
On November 22, 1997, the NRC completed an inspection at your H. B. Robinson
reactor facility. The enclosed report presents the results of that
inspection.
During the six-week period covered by this inspection period, your conduct of
activities at the H. B. Robinson facility was generally characterized by
safety-conscious operations, sound engineering and maintenance practices, and
careful radiological work controls. However, a violation of NRC requirements
was identified. The violation involves the failure to adequately control post
modification testing related to the Containment Air Recirculation Cooling
(CARC) System. This included an evaluation that was not conducted when a post
modification test acceptance criterion was not met and the failure to conduct
cooling capability test during post modification testing. This failure
contributed to the containment average air temperature design limit during
power operations being challenged; however, it did not adversely impact the
post-accident design function of the CARC System. Therefore, the violation
has been characterized as a Severity Level IV violation.
The violation is cited in the enclosed Notice of Violation (Notice), and the
circumstances surrounding the violation are described in detail in the
enclosed report. Please note that you are required to respond to this letter
and should follow the instructions specified in the enclosed Notice when
preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements.
9801210298 971222
PDR ADOCK 05000261
G
2
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room
(PDR).
Sincerely,
Orignuained by M. BShymlock
Milton B. Shymlock, Chief
Reactor Projects Branch 4
Division of Reactor Projects
Docket No. 50-261
License No. DPR-23
Enclosures: 1. Notice of Violation
2. NRC Inspection Report
cc w/encls:
Dale E. Young
Director, Site Operations
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
3581 West Entrance Road
Hartsville, SC 29550
J. W. Moyer
Plant General Manager
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
3581 West Entrance Road
Hartsville, SC 29550
D. B. Alexander, Manager
Performance Evaluation and
Regulatory Affairs
0HS7
Carolina Power & Light Company
412 S. Wilmington Street
Raleigh, NC 27601
(cc w/encls cont'd - See page 3)
3
(cc w/encls cont'd)
H. K. Chernoff, Supervisor
Licensing/Regulatory Programs
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
3581 West Entrance Road
Hartsville, SC 29550
T. M. Wilkerson, Manager
Regul atory Affairs
Carolina Power & Light Company
H. B. Robinson Steam Electric Plant
3581 West Entrance Road
Hartsville, SC 29550
Max Batavia, Chief
Bureau of Radiological Health
Dept. of Health and Environmental
Control
2600 Bull Street
Columbia, SC 29201
Mel Fry, Acting Director
Division of Radiation Protection
N. C. Department of Environment,
Health & Natural Resources
3825 Barrett Drive
Raleigh, NC
27609-7721
W. D. Johnson, Vice President
and Senior Counsel
Carolina Power & Light Co.
P. 0. Box 1551
Raleigh, NC 27602
Karen E. Long
Assistant Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC 27602
(cc w/encls cont'd - See page 4)
4
(cc w/encls cont'd)
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
Public Service Commission
State of South Carolina
P. 0. Box 11649
Columbia, SC 29211
Hartsville Memorial Library
147 W. College Avenue
Hartsville, SC 29550
Distribution w/encls:
M. Shymlock, RII
J. Shea, NRR
T. Scarbrough, NRR
J. Coley, RII
R. Baldwin, RII
J. Lenahan, RII
W. Rankin, RII
D. Thompson, RII
E. Kelly, RI
W. Kropp, RIII
T. Stetka, RIV
PUBLIC
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
2112 West Old Camden Road
Hartsville, SC 29550
- (See previous concurrence)
OFFICE
RII:DRP
R.II:DRP
RII:DRS
RII:DRS
NRR:EMEB
PTT :_RP
SIGNATURE
f
I*.
NAME
FJape
BDesai
EGirard
Huhitener
DTerao
JZeiler
DATE
12/
/97
12/
/97
12/ 4,
/97
12/
/97
2
/97
12/
/97
12/
9
COPY?
YES
NO
YES
NO
NO
YES
NO
YES
NO
YES
NO
YES
NO
OFFICIAL RECORD COPY
DOCUMENT NAME:
G:\\ROBINSON\\IRCURR\\9712.011
4
(cc w/encls cont'd)
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
Public Service Commission
State of South Carolina
P. 0. Box 11649
Columbia, SC 29211
Hartsville Memorial Library
147 W. College Avenue
Hartsville, SC 29550
Distribution w/encls:
M. Shymlock, RII
J. Shea, NRR
J. Coley, RII
.
R. Baldwin, RII
J. Lenahan, RII
W. Rankin, RII
D. Thompson, RII
PUBLIC
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
.2112 West Old Camden Road
Hartsville, SC 29550
- (See previous page for concurrence)
OFFICE
RII:DRP
RII:DRP
RII:DRS
RII:DRS
SIGNATURE
NAME
FJape
BDesai
EGirard
itener
DATE
12/
/ 9:7 12/
/97
12/
/
/97
1/
/97
12/
/97
12/
/97 '12/
/97
COPY?
YE
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
YES
NO
OFFICIAL RECORD COPY
DOCUMENT NAME:
G:\\ROBINSON\\IRCURR\\9712.ROB
0
FRI, DEC-19-97 11:34HM
NRC ROBINSON RI SITE
803 383 6441
P.02
4
(cc w/encls cont'd)
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
Public Service Commission
State of South Carolina
P. 0. Box 11649
Columbia, SC 29211
Hartsville Memorial Library
147 W. College Avenue
Hartsville, SC
29550
Distribution wlencl s:
M. Shymlock, RII
J. Shea, NRR
J. Coley, RII
R. Baldwin, RII
J. Lenahan, RH
W. Rankin. RII
D. Thompson. RII
PUBLIC
NRC Resident Inspector
0. S. Nuclear Regulatory Commissiur
2112 West Old Camden Road
Hartsville, SC 29550
NAME
RS
BDesai
toirard
tenar
DATZ
72
/3J97
12
/97
12/
/SW
iF7/
13
797
-1:7....
09
fSt
Mo
___ No
YES
gO
YES
NO
d
ND
-79oT.
NM
orzCIAL
sCORD COPY
ocuxrT Nls awa G:\\BINSONB\\RCURR\\9712.ROB
TOTAL P.02