Summary of 980611 Meeting W/Util in Rockville,Md Re Application for Review of Best Estimate LOCA Models for Plant,Unit 2.List of Attendees & Handouts Encl
ML14181A432
Person / Time
Site: Robinson 
Issue date: 07/20/1998
From: James Shea
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9807240031
Download: ML14181A432 (4)


Text

o

~REc(

o4 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 20, 1998 LICENSEE: Carolina Power & Light Company FACILITY: H. B. Robinson Steam Electric Plant, Unit 2

SUBJECT:

SUMMARY

OF JUNE 11, 1998, MEETING REGARDING APPLICATION FOR REVIEW OF BEST ESTIMATE LOSS-OF-COOLANT ACCIDENT (LOCA)

MODELS - H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 On June 11, 1998, members of the NRC staff met with Carolina Power & Light Company (CP&L or licensee) personnel at the NRC offices in Rockville, Maryland, to discuss the licensee's plan to apply for review of a best estimate LOCA model for H.B. Robinson, Unit 2. The licensee was accompanied by representatives of Siemens Power Corporation, who participated in the meeting. A list of attendees is included as Enclosure 1. The licensee's meeting handout is included as Enclosure 2.

The licensee described the desirability of implementing a realistic large break LOCA methodology at both H.B. Robinson and the Shearon Harris Nuclear Plant as a basis for relieving the regulatory burden associated with the current 10 CFR 50, Appendix K methodologies, which are used to demonstrate compliance with 10 CFR 50.46. In addition, the licensee expects that by implementing realistic LOCA methodologies, it will recover peaking factor margins and thus facilitate planned power uprate and steam generator replacement projects at Harris. The licensee and Siemens described the history of realistic large break LOCA methodologies within Siemens and the history of NRC reviews of those methodologies.

The licensee proposed to submit a realistic LOCA analyses for Robinson in February 1999.

The staff advised the licensee that staff resources for reviewing such a methodology are extremely limited and that it could not guarantee that resources would be available to complete a licensing review of such a methodology by the early 2001 timeframe requested by the licensee. The staff also provided insights gained from the review of a realistic LOCA methodology developed by another vendor. Specifically, the staff discussed document requirements, electronic document management, quality assurance insights, and necessary staffing expertise needed to develop and present the methodology. The staff stated that it would perform a rigorous acceptance review prior to starting any substantive reviews.

The licensee presented plans to address recently identified weaknesses in its existing Appendix K-based large break LOCA analysis. The licensee and Siemens described a schedule for submitting a revised Appendix K methodolgy as well as revised Appendix K-based analyses 9807240031 980720 PDR ADOCK 05000261 P

PDR

July 20,.1998

-2 for both Harris and Robinson for current plant conditions as well as for future, expected plant conditions. The staff indicated that resources would be identified to perform the staff reviews of these Appendix K methodologies and analyses as necessary to demonstrate ongoing compliance with 10 CFR 50.46.

After a brief summary, the meeting was adjourned.

Original siged by Joesph W.Shea, Project Manager Project Directorate 11-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

Enclosures:

1. Attendance List
2. Meeting Handout Docket No. 50-261 cc w/enclosures:

See next page Distribution (w/enclosures)

Docket File RSubbaratnam PUBLIC RCaruso PDII-1 RF FOrr OGC JStaudenmeier ACRS SFlanders S. Collins/F. Miraglia PTKuo R. Zimmerman 1T (. /rt-4 9 B. Boger M. Tschiltz L. Plisco, RII FILENAME -

G:\\RONSON\\698MEET.SUM OFFICE PM:P

/

LA:PDII-1 SRXB D:PDII-1(A)

NAME JShe Dunning on R

o PTIua DATE 06/3198 017 98 07/.I98 COPY Yes/No eso Yes No Yes/No OFFICIAL FXARD COPY

H. B. Robinson Steam Electric Plant, Unit No. 2 cc:

Mr. William D. Johnson Mr. Mel Fry, Director Vice President and Senior Counsel N.C. Department of Environment Carolina Power & Light Company and Natural Resources Post Office Box 1551 Division of Radiation Protection Raleigh, North Carolina 27602 3825 Barrett Dr.

Raleigh, North Carolina. 27609-7721 Ms. Karen E. Long Assistant Attorney General Mr. Robert P. Gruber State of North Carolina Executive Director Post Office Box 629 Public Staff - NCUC Raleigh, North Carolina 27602 Post Office Box 29520 Raleigh, North Carolina 27626-0520 U.S. Nuclear Regulatory Commission Resident Inspector's Office Mr. Max Batavia, Chief H. B. Robinson Steam Electric Plant South Carolina Dept. of Health 2112 Old Camden Road Bureau of Radiological Health Hartsville, South Carolina 29550 and Environmental Control 2600 Bull Street Regional Administrator, Region 11 Columbia, South Carolina 29201 U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Ms. D. B. Alexander, Manager Atlanta, Georgia 30303 Performance Evaluation and Regulatory Affairs CPB 9 Mr. J. W. Moyer Carolina Power & Light Company Director of Site Operations Post Office Box 1551 Carolina Power & Light Company Raleigh, North Carolina 27602-1551 H. B. Robinson Steam Electric Plant Unit No. 2 3581 West Entrance Road Mr. D. E. Young, Site Vice President Hartsville, South Carolina 29550 Carolina Power & Light Company H. B. Robinson Steam Electric Plant Public Service Commission Unit No. 2 State of South Carolina Post Office Box 790 Post Office Drawer 11649 Hartsville, South Carolina 29550 Columbia, South Carolina 29211 Mr. H. K. Chernoff Mr. T. M. Wilkerson Supervisor, Licensing/Regulatory Programs Manager - Regulatory Affairs Carolina Power & Light Company Carolina Power & Light Company H. B. Robinson Steam Electric Plant, H. B. Robinson Steam Electric Plant Unit No.2 Unit No.2 3581 West Entrance Road 3581 West Entrance Road Hartsville, South Carolina 29550 Hartsville, South Carolina 29550-0790

MEETING ATTENDANCE LIST JUNE 11, 1998 NAME ORGANIZATION

1. R. Caruso NRC/NRR/SRXB
2. J. Staudenmeier NRC/NRR/SRXB
3. F. Orr NRC/NRR/SRXB
4. V. Mousseau NRC/RES/RPSB
5. J. Shea NRC/NRR/PD2-1
6. H. Chernoff CP&L
7. D. Poteralski CP&L
8. L. Wells CP&L
9. R. Feuerbacher Siemens Power Corp.
10. L. O'Dell Siemens Power Corp.
11. S. Jensen Siemens Power Corp.
12. J. Mallay Siemens Power Corp.
13. J. Holm Siemens Power Corp.
14. J. Bastin Westinghouse ENCLOSURE 1