Forwards Insp Rept 50-261/93-35 on 931122-1203.Apparent Violations Being Considered for Escalated Enforcement Action
ML14178A517
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/20/1993
From: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dietz C
CAROLINA POWER & LIGHT CO.
Shared Package
ML14178A518 List:
References
EA-93-298, NUDOCS 9401040379
Download: ML14178A517 (5)


See also: IR 05000261/1993035

Text

K

.C

20 1993

Docket No.:

50-261

License No.:

DPR-23

EA 93-298

Carolina Power and Light Company

ATTN: Mr. C. R. Dietz

Vice President

H. B. Robinson Steam Electric Plant, Unit 2

P. 0. Box 790

Hartsville, SC 29550-0790

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/93-35

This refers to the inspection conducted by W. T. Orders of this office on

November 22 through December 3, 1993. The inspection included a review of

activities authorized for your H. B. Robinson facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

.Areas

examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, two apparent violations were

identified and are being considered for escalated enforcement action in

accordance with the "General Statement of Policy and Procedure for NRC

Enforcement Actions" (Enforcement Policy), 10 CFR Part 2, Appendix C. One

apparent violation involves the potential for simultaneous inoperability of

both EDGs when the unit was operated at power between the dates of November 12

and November 17, 1993.

The other apparent violation involves potential

inadequate corrective actions pertaining to the event of October 25, 1993 in

which the "B" EDG failed to start, which led to a similar related failure of

the EDG on November 22, 1993. Accordingly, no Notice of Violation is

presently being issued for these findings. Please be advised that the number

and characterization of apparent violations described in the enclosed

inspection report may change as a result of further NRC review.

An enforcement conference to discuss these apparent violations has been

scheduled for December 29, 1993. The purposes of this conference are to

discuss the apparent violations, their cause and safety significance, to

provide you the opportunity to point out any errors in our inspection report

and to provide an opportunity for you to present your proposed corrective

actions. In addition, this is an opportunity for you to provide any

information concerning your perspective of 1) the severity of the issue,

2) the factors the NRC considers when it determines the amount of a civil

penalty that may be assessed in accordance with Section VI.B.2 of the

Enforcement Policy, and 3) the possible basis for exercising discretion in

9401040379 931220

PDR ADOCK 05000261

Q

PDR

DEC 2 0 99

-

Carolina Power and Light Company

2

accordance with Section VII of the Enforcement Policy. You will be advised in

separate correspondence of the results of our deliberations in this matter.

No response regarding the apparent violations is required at this time.

This enforcement conference will be open to public observation in accordance

with the Commissions's trial program as discussed in the enclosed Federal

Register Notice (Enclosure 2).

Although not required, we encourage you to

provide your comments on how you believe holding this conference open to

public observation affected your presentation and your communications with the

NRC.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Ellis W. Merschoff, Director

Division of Reactor Projects

Enclosures:

1. NRC Inspection Report

2. Federal Register Notice

cc w/encls:

M. P. Pearson

Plant Manager

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC

29550

H. W. Habermeyer, Jr.

Vice President

Nuclear Services Department

Carolina Power & Light Company

P. 0. Box 1551 - Mail OHS7

Raleigh, NC

27602

D. B. Waters, Manager

Regulatory Compliance

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC

29550

(cc w/encls cont'd - See page 3)

DEC 20 1993

Carolina Power and Light Company

3

(cc w/encls cont'd)

Max Batavia, Chief

Bureau of Radiological Health

Dept. of Health and Environmental

Control

2600 Bull Street

Columbia, SC 29201

Dayne H. Brown, Director

Division of Radiation Protection

N. C. Department of Environment,

Commerce & Natural Resources

P. 0. Box 27687

Raleigh, NC

27611-7687

McCuen Morrell, Chairman

Darlington County Board of Supervisor

County Courthouse

Darlington, SC 29535

H. Ray Starling

Vice President -

Legal Department

Carolina Power and Light Co.

P.

0.

Box 1551

Raleigh, NC 27602

Karen E. Long

Assistant Attorney General

State of North Carolina

P. 0. Box 629

Raleigh, NC

27602

Robert P. Gruber

Executive Director

Public Staff - NCUC

P. 0. Box 29520

Raleigh, NC 27626-0520

Public Service Commission

State of South Carolina

P. 0. Box 11649

Columbia, SC 29211

bcc w/encls:

(See page 4)

Carolina Power and Light Company

3

(cc w/encl cont'd)

McCuen Morrell, Chairman

Darlington County Board of Supervisor

County Courthouse

Darlington, SC

29535

H. Ray Starling

Vice President - Legal Department

Carolina Power and Light Co.

P. 0. Box 1551

Raleigh, NC 27602

Karen E. Long

Assistant Attorney General

State of North Carolina

P. 0. Box 629

Raleigh, NC 27602

Robert P. Gruber

Executive Director

Public Staff - NCUC

P. 0. Box 29520

Raleigh, NC 27626-0520

O

Public Service Commission

State of South Carolina

P. 0. Box 11649

Columbia, SC

29211

bcc w/encl:

H. Christensen, RII

B. Mozafari, NRR

Document Control Desk

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

Route 5, Box 413

Hartsville, SC

29550

II:DRP,

RII:DRP

RII:DR

RII:DRS

RII:E

RII:ORA

RII:DPR

  • OStarefos:tj

HChristensen DVerrelli AGibson

1 5eankins

CEvans

JJohnson

12//,/93

12/

/93

12/j</93

12/

/93

12/75-/93

12/

/93

12/ /93

DEC 201993

.

Carolina Power and Light Company

4

bcc w/encls:

H. Christensen, RH

B. Mozafari, NRR

Document Control Desk

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

Route 5, Box 413

Hartsville, SC 29550

  • SEE PREVIOUS CONCURRENCE

RII:DRP

RII:D P

RII:DRP

RIIDRS

RII:EICS

RII:ORA 6-bRI :DR

JStarefos:tj

HCh stensen *DVerrelliftASbson

  • GJenkins

CEvans

JJ

on

12/

/93

12/ 793

12/ /93

12/11L/93

12/

/93

12/, -/93

1 /

/93