ML14178A482
| ML14178A482 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 05/10/1994 |
| From: | Casto C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Hinnant C CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14178A483 | List: |
| References | |
| NUDOCS 9405160208 | |
| Download: ML14178A482 (6) | |
See also: IR 05000261/1994006
Text
ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
OCESSION NBR:9405160208
DOC.DATE: 94/05/10
NOTARIZED: NO
DOCKET #
FACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
AUTH.NAME
AUTHOR AFFILIATION
CASTO,C.
Region 2 (Post 820201)
RECIP.NAME
RECIPIENT AFFILIATION
HINNANT,C.S.
Carolina Power & Light Co.
'
R
SUBJECT: Forwards insp rept 50-261/94-06 on 940328-0401.No violations
or deviations noted.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL
SIZE:
>j+/-
D
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response
S
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
A
PD2-1 PD
1
1
MOZAFARI,B
1
1
D
INTERNAL: AEOD/DEIB
1
1
AEOD/DSP/ROAB
1
1
AEOD/DSP/TPAB
1
1
AEOD/TTC
1
1
D
DEDRO
1
1
NRR/DORS/OEAB
1
1
NRR/DRCH/HHFB
1
1
NRR/DRIL/RPEB
1
1
S
NRR/DRSS/PEPB
1
1
NRR/PMAS/ILPB1
1
1
NRR/PMAS/ILPB2
1
1
NUDOCS-ABSTRACT
1
1
OE DIR
1
1
OGC/HDS2
1
1
( REG FIt-E
02
1
1
RES/HFB
1
1
RGN2
FILE
01
1
1
ERNAL:
EG&G/BRYCE,J.H.
1
1
NRC PDR
1
1
1
1
R
I
D
S
A
D
D
NOTE TO ALL "RIDS" RECIPIENTS:
S
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK,
ROOM Pl-37 (EXT. 20079) TO ELIMINATE YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
22
ENCL
22
MAY
D
00/
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:
Mr. C. S. Hinnant
Vice President
H. B. Robinson Steam Electric Plant
Unit 2
P. 0. Box 790
Hartsville, SC
29550-0790
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/94-06
This refers to the inspection conducted by E. Girard of this office on
March 28 - April 1, 1994.
The inspection included a review of activities
authorized for your Robinson facility. At the conclusion of the inspection,
the.findings were discussed with those members of your staff identified in the
report.
.This
inspection evaluated the implementation of the motor-operated valve (MOV)
program that you have developed to meet your commitments to Generic Letter
(GL) 89-10, "Safety-Related Motor-Operated Valve Testing and Surveillance."
The inspection consisted of interviews with personnel and selective
examination of records and procedures for a sample of MOVs.
Based.on the
evaluation completed, we conclude that you are implementing a satisfactory
program in response to GL 89-10. However, it should be noted that your
implementation of the program and its evaluation by the NRC are incomplete.
The enclosed report identifies issues that will require further evaluation.
Within the scope of the inspection, violations or deviations were not identi
fied.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of
this letter and its enclosure will be placed in the NRC Public Document Room.
9405160208 940510
PDR ADOCK 05000261
0
Carolina Power & Light Co.
2
Should you have any questions concerning this letter, please contact us.
Sincere y,
Charles Casto, Acting Chief
Engineering Branch
-
Division of Reactor Safety
Enclosure:
NRC Inspection Report
cc w/encl:
M. P. Pearson
Plant Manager
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC
29550
H. W. Habermeyer, Jr.
Vice President
Nuclear Services Department
Carolina Power & Light Company
P. 0. Box 1551
-
Mail 0HS7
Raleigh, NC
27602
R. Krich, Manager
Regulatory Compliance
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC
29550
Max Batavia, Chief
Bureau of Radiological Health
Dept. of Health and Environmental
Control
2600 Bull Street
Columbia, SC 29201
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Commerce & Natural Resources
P. 0. Box 27687
Raleigh, NC
27611-7687
(cc w/encl cont'd - See page 3)
Carolina Power & Light Co.
3
MAY 10 n99
(cc w/encl cont'd)
H. Ray Starling
Manager -
Legal Department
Carolina Power and Light Co.
P. 0. Box 1551
Raleigh, NC 27602
Karen E. Long
Assistant Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC
27602
Robert P. Gruber
Executive Director
Public Staff -
NCUC
P. 0. Box 29520
Raleigh, NC
27626-0520
Public Service Commission
State of South Carolina
P. 0. Box 11649
S Columbia, SC 29211
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC
27626-0520
Public Service Commission
State of South Carolina
P. 0. Box 11649
Columbia, SC 29211
(bcc w/encl - See page 4)
.
Carolina Power & Light Co.
4
MAY
0 1994
bcc w/encl:
H. Christensen, RII
G. Hal1strom, RII
B. Mozafari, NRR
E. Kelly, RI
J. Jacobson, RIII
T. Westerman, RIV
W. Ang, RV
T. Scarbrough, NRR
Document Control Desk
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
Route 5, Box 413
Hartsville, SC 29550
- FOR PREVIOUS CONCURRENCE SEE ATTACHED COPY
SEND
OFC
RII:DRS
RII:DRS
RII:DRS
RII:DRP
NRR:MEB
TJV1
AllY'
+V-
.-
'e
TO
NAME
MMiLLer
M
MHunt
,
EGirard
HChristensen
Jor erg
DATE
/1AC /94
/94/
/94
/
/9
/(/94
No COPY?
No
e
No
No
,es
No
Yes
No
OFFICIAL RECORD COPY
DOCUMENT NAME:
S:\\DRS\\EB\\ROB94-06.EHG
Carolina Power & Light Co.
4
bcc w/encl:
H. Christensen, RH
G. Hallstrom, RII
B. Mozafari, NRR
P. K. Eapen, RI
J. Jacobson, RIII
T. Westerman, RIV
W. Ang, RV
T. Scarbrough, NRR
Document Control Desk
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
Route 5, Box 413
Hartsville, SC
29550
SEND
OFC
RII:DRS
RII:DRS
RI :DRS
RII:DRP
NRR:MEB
TO
NAME
MMiller
MHunt
EGirard
HChristensen
JNorberg
PDR?
DATE
/ 4/94
/
/94
/4 /94
/94
/
/94
- No COPY?
No
No
No
Yes
No
Yes
No
OFFICIAL RECORD COPY
DOCUMENT NAME:
S:\\DRS\\EB\\ROB94-06.EHG