ML14178A431
| ML14178A431 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 01/18/1994 |
| From: | Peebles T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Dietz C CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14178A432 | List: |
| References | |
| NUDOCS 9401250038 | |
| Download: ML14178A431 (3) | |
See also: IR 05000261/1994002
Text
JAN 18
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:' Mr. C. R. Dietz
Vice President
H. B. Robinson Steam Electric Plant
Unit 2
P. 0. Box 790
Hartsville, SC
29550-0790
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/94-02
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
Ronald F. Aiello on January 4-6, 1994. The inspection included a review of
activities authorized for your H. B. Robinson Steam Electric Plant. At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress. A restart requirements letter from your facility to
the NRC dated December 31, 1993, is included as Enclosure 2.
Within the scope of this inspection, no violations or deviations were
identified.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL SIGNED BY T. A. PEEBLES
Thomas A.Peebles, Chief
Operations Branch
Division of Reactor Safety
O
Enclosures:
(See Page 2)
240014
9401250038 940118
PDR ADOCK 05000261
a
Carolina Power & Light Co.
2
Enclosures:
1. NRC Inspection Report
2. Restart Requirements Ltr fr
HBR Unit 2 to NRC dtd 12/31/93
cc w/encls 1 and 2:
M. P. Pearson
Plant Manager
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
H. W. Habermeyer, Jr.
Vice President
Nuclear Services Department
Carolina Power & Light Company
P. 0. Box 1551
- Mail OHS7
Raleigh, NC
27602
W. Dorman, Acting Manager
Regulatory Affairs
H. B. Robinson Steam Electric Plant
P.
0.
Box 790
Hartsville, SC
29550
Max Batavia, Chief
Bureau of Radiological Health
Dept. of Health and Environmental
Control
2600 Bull Street
Columbia, SC
29201
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Commerce & Natural Resources
P. 0. Box 27687
Raleigh, NC
27611-7687
H. Ray Starling
Manager -
Legal Department
Carolina Power and Light Co.
P. 0. Box 1551
Raleigh, NC 27602
cc w/encls cont'd:
(See page 3)
Carolina Power & Light Co.
3
JAN 18 94
cc w/encls cont'd:
Karen E. Long
Assistant Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC
27602
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
Public Service Commission
State of South Carolina
P. 0. Box 11649
Columbia, SC 29211
bcc w/encl:
H. Christensen, RH
B. Mozafari, NRR
J. Jaudon, DRS
G.
Hallstrom, DRS
Document Control Desk
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
Route 5, Box 413
Hartsville, SC
29550
RII RS
RHI: S
RI
R
RI:R S
RAiello:rfa/sd
LLaw er
HChris ensen
T ee les
01/f/94
01/(2/94
01/
/94
01// 794
Document Name: G:\\1a\\robinson\\AITO2RPT.RFA