ML14178A380
| ML14178A380 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 09/10/1993 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Dietz C Carolina Power & Light Co |
| Shared Package | |
| ML14178A381 | List: |
| References | |
| NUDOCS 9309280207 | |
| Download: ML14178A380 (3) | |
See also: IR 05000261/1993018
Text
SEP 1 0 1993
Docket No.: 50-261
License No.:
Carolina Power and Light Company
ATTN: Mr. C. R. Dietz
Vice President
H. B. Robinson Steam Electric Plant,
Unit 2
P. 0. Box 790
Hartsville, SC 29550-0790
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/93-18
This refers to the inspection conducted by W. T. Orders of this office on
July 10 - August 14, 1993. The inspection included a review of activities
authorized for your H. B. Robinson facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements as specified in the enclosed Notice of
Violation (Notice). The first violation is of concern to the NRC because it
represents a multi-faceted programmatic issue dealing with design control,
with contributors of corrective actions, post modification testing and post
modification testing deficiencies. This deterioration in your design control
process, culminated in the Reactor Auxiliary Building Ventilation System being
degraded for an extended period of time.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
9309280207 930910 270077
PDR ADOCK 05000261
0
PDR .
SEP \\ 0 1993
Carolina Power and Light Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original signed by:
Floyd S. Cantrell/for
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosures:
2. NRC Inspection Report
cc w/encls:
R. H. Chambers, Jr.
Plant Manager
H. B. Robinson Steam Electric Plant
P.-0. Box 790
Hartsville, SC 29550
H. W. Habermeyer, Jr.
Vice President
Nuclear Services Department
.Carolina
Power & Light Company
P. 0. Box 1551 - Mail OHS7
Raleigh, NC 27602
J. L. Harrison, Manager
Regulatory Compliance
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
Max Batavia, Chief
Bureau of Radiological Health
Dept. of Health and Environmental
Control
2600 Bull Street
Columbia, SC 29201
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Commerce & Natural Resources
P. 0. Box 27687
Raleigh, NC
27611-7687
(cc w/encls cont'd - See page 3)
SEp 1 0 1993
Carolina Power and Light Company
3
.(cc
w/encls cont'd)
McCuen Morrell, Chairman
Darlington County Board of Supervisor
County Courthouse
Darlington, SC 29535
H. Ray Starling
Vice President -
Legal Department
Carolina Power and Light Co.
P. 0. Box 1551
Raleigh, NC 27602
Karen E. Long
Assistant Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC 27602
Robert P. Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
Public Service Commission
State of South Carolina
P. 0. Box 11649
Columbia, SC 29211
bcc w/encls:
H. Christensen, RH
B. Mozafari, NRR
Document Control Desk
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
Route 5, Box 413
Hartsville, SC 29550
RII;DRP
HCh
tensen:tj
wII 09/
/93
,