Text
FOR
1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9308050091
DOC.DATE: 93/07/02 NOTARIZED: NO
DOCKET #
I ACIL:50-261 H.B. Robinson Plant, Unit 2, Carolina Power & Light C 05000261
UTH.NAME
AUTHOR AFFILIATION
ERSCHOFF,E.W.
Region 2 (Post 820201)
RECIP.NAME
RECIPIENT AFFILIATION
DIETZC.R.
Carolina Power & Light Co.
SUBJECT: Forwards insp rept 50-261/93-11 on 930515-0611 & notice of
violation.Concerned about violation involving erroneous
deletion of procedural precaution due to similarity to non
cited violation rnoted in insp rept 50-261/93-05.
DISTRIBUTION CODE: IE01D COPIES RECEIVED:LTR
ENCL I SIZE:
Ai g/
TITLE: General (50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES:
RECIPIENT
COPIES
RECIPIENT
COPIES
ID CODE/NAME
LTTR ENCL
ID CODE/NAME
LTTR ENCL
PD2-1 PD
1
1
MOZAFARI,B
1
1
INTERNAL: AEOD/DEIB
1
1
AEOD/DSP/ROAB
1
1
AEOD/DSP/TPAB
1
1
AEOD/TTC
1
1
DEDRO
1
1
NRR/DORS/OEAB
1
1
NRR/DRCH/HHFB
1
1
NRR/DRIL/RPEB
1
1
NRR/DRSS/PEPB
1
1
NRR/PMAS/ILPB1
1
1
NRR/PMAS/ILPB2
1
1
NUDOCS-ABSTRACT
1
1
OE DIR
1
1
OGC/HDS2
1
1
.GFIE--= 02
1
1
RES/HFB1
1[
RGN2
FILE 01
1
1
EXTERNAL: EG&G/BRYCE,J.H.
1
1
NRC PDR
NSIC1
1
A
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM PI1-37 (EXT. 504-2065) TO ELIMINATE YOUR NAME FROM DISTRIBUTION
LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR
22
ENCL
22
Docket No.: 50-261
License No.: DPR-23
Carolina Power and Light Company
ATTN:
Mr. C. R. Dietz
Vice President
H. B. Robinson Steam Electric Plant
Unit 2
P. 0. Box 790
Hartsville, SC 29550-0790
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/93-11)
This refers to the inspection conducted by W. T. Orders of this office on
May 15 - June 11, 1993.
The inspection included a review of activities
authorized for your H. B. Robinson facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements as specified in the enclosed Notice of
Violation (Notice). We are particularly concerned about the violation
involving an erroneous deletion of a procedural precaution, for it is similar
to a non-cited violation contained in Inspection Report 93-05 which was sent
to you by our letter dated April 9, 1993. Recurring violations are of
particular concern because the NRC expects licensees to learn from their past
failures and to take effective corrective actions. Although the NRC does not
normally consider monetary civil penalties for Severity Level IV violations,
the Enforcement Policy states that such penalties may be imposed for severity
level IV violations for which the licensee did not take effective corrective
action. In this case, we have decided not to hold an enforcement conference
nor to propose a civil penalty because of the minor significance of the
violation and the prompt corrective actions initiated upon the identification
of this violation.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. In your
response, you should document the specific actions taken and any additional
9308050091 930702
ADOCK 05000261
0
PDR.
TE-OI
JUL - 2 1993
Carolina Power and Light Company
2
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original signed by:
Ellis W. Merschoff
Ellis W. Merschoff, Director
Division of Reactor Projects
Enclosures:
2. NRC Inspection Report
cc w/encls:
Mr. W. T. Flanagan
Acting Plant General Manager
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
Mr. W. S. Orser
Executive Vice President
Nuclear Generation
Carolina Power & Light Company
P. 0. Box 1551 Mail Code - CPB 12
Raleigh, NC 27602
Mr. H. W. Habermeyer, Jr.
Vice President
Nuclear Services Department
Carolina Power & Light Company
P. 0. Box 1551 - Mail 0HS7
Raleigh, NC 27602
(cc w/encls cont'd - See page 3)
Carolina Power and Light Company
3
JUL
2 199
(cc w/encls cont'd)
Heyward G. Shealy, Chief
Bureau of Radiological Health
Dept. of Health and Environmental
Control
2600 Bull Street
Columbia, SC 29201
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Health & Natural Resources
P. 0. Box 27687
Raleigh, NC
27611-7687
McCuen Morrell, Chairman
Darlington County Board of Supervisor
County Courthouse
Darlington, SC 29535
H. Ray Starling
Vice President - Legal Department
.Carolina
Power and Light Co.
P. 0. Box 1551
Raleigh, NC 27602
H. A. Cole
Special Deputy Attorney General
State of North Carolina
P. 0. Box 629
Raleigh, NC 27602
Robert Gruber
Executive Director
Public Staff - NCUC
P. 0. Box 29520
Raleigh, NC 27626-0520
J. L. Harrison, Manager
Regulatory Compliance
H. B. Robinson Steam Electric Plant
P. 0. Box 790
Hartsville, SC 29550
Ms. Gayle B. Nichols
Staff Counsel
SC Public Service Commission
P. 0. Box 11649
Columbia, SC 29211
Carolina Power and Light Company
4
JUL
bcc w/encls:
H. Christensen, RII
S. Vias, RH
B. Mozafari, NRR
Document Control Desk
NRC Resident Inspector
U. S. Nuclear Regulatory Commission
Route 5, Box 413
Hartsville, SC 29550
RII:DRP
RII: RP
RII:DRP
RI*
R
- tj
HChrstensen
DVerrei
G n ns
06/ /93
07/ L /93
07/1 /93
07/ /93