Forwards Insp Rept 50-261/92-25 on 920824-28 & Notice of Violation.Concern Noted Re Implementation of Procedures. Response to Violations Should Describe Actions to Improve Effectiveness of Program,Per Encl NOV
ML14178A281
Person / Time
Site: Robinson 
Issue date: 09/30/1992
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Watson R
CAROLINA POWER & LIGHT CO.
Shared Package
ML14178A282 List:
References
NUDOCS 9210060230
Download: ML14178A281 (4)


See also: IR 05000261/1992025

Text

September 30, 1992

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

ATTN: Mr. R. A. Watson

Senior Vice President

Nuclear Generation

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-261/92-25)

This refers to the inspection conducted by G. MacDonald of this office on

August 24-28, 1992.

The inspection included a review of activities authorized

for your H. B. Robinson facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation (Notice). The violation is of concern because it demonstrated a.

weakness in procedures to recover from a loss of offsite power. This is

significant since H. B. Robinson has only one source of offsite power and this

source has demonstrated single point vulnerability.

In addition to the need for corrective action regarding the specific matters

identified in the enclosed Notice, we are concerned about the implementation

of your procedures that permitted this situation to develop. Consequently,

your response should describe those particular actions taken or planned-to

improve the effectiveness of your program. The current procedure for

backfeeding offsite power to the plant, following a loss of offsite power

(LOSP), via the main and auxiliary transformers did not address the

conditions when the startup transformer was unavailable. During the

inspection we requested that you develop a procedure to restore offsite power

via backfeeding under LOSP conditions and include in your response to this

letter the schedule for implementing this procedure.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your

response, you should document the specific actions taken and any additional

9210060230 920930

PDR ADOCK 05000261

0

PDR

Carolina Power and Light Company

2

September 30, 1992

actions you plan to prevent recurrence. After reviewing your response to this

Notice, including your proposed corrective actions the NRC will determine

whether further NRC enforcement action is necessary to ensure compliance with

NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Caudle A. Julian, Chief

Engineering Branch

Division of Reactor Safety

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls:

C. R. Dietz

Vice President

Robinson Nuclear Project Department

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC

29550

R. H. Chambers

Plant General Manager

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

Heyward G. Shealy, Chief

Bureau of Radiological Health

Dept. of Health and Environmental

Control

2600 Bull Street

Columbia, SC

29201

(cc w/encls cont'd - see page 3)

Carolina Power and Light Company

3

September 30, 1992

(cc w/encls cont'd)

Dayne H. Brown, Director

Division of Radiation Protection

N. C. Department of Environment,

Health & Natural Resources

P. 0. Box 27687

Raleigh, NC

27611-7687

McCuen Morrell, Chairman

Darlington County Board of Supervisor

County Courthouse

Darlington, SC 29535

H. Ray Starling

Vice President -

Legal Department

Carolina Power and Light Co.

P. 0. Box 1551

Raleigh, NC

27602

H. A. Cole

Special Deputy Attorney General

State of North Carolina

P.

0.

Box 629

Raleigh, NC

27602

Robert Gruber

Executive Director

Public Staff - NCUC

P. 0. Box 29520

Raleigh, NC 27626-0520

J. L. Harrison, Manager

Regulatory Compliance

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

Ms. Gayle B. Nichols

Staff Counsel

SC Public Service Commission

P. 0. Box 11649

Columbia, SC

29211

bcc w/encls:

(See page 4)

Carolina Power and Light Company

4

September 30, 1992

bcc w/encls:

H. Christensen, RII

B. Mozafari, NRR

R. Carroll, RH

R. Lo, NRR

G. Jenkins, RH

Document Control Desk

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

Route 5, Box 413

Hartsville, SC 29550

RJI:DRS

RII:DRP

GMacDorald

MShymlock

HChristensen

09/2, /92

09/so /92

09/

/92