ML14178A228

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/92-11 on Stated Date & Notice of Violations
ML14178A228
Person / Time
Site: Robinson 
Issue date: 06/01/1992
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Watson R
Carolina Power & Light Co
Shared Package
ML14178A229 List:
References
NUDOCS 9206230088
Download: ML14178A228 (3)


See also: IR 05000261/1992011

Text

Docket No:

50-261

License No:

DPR-23

Carolina Power and Light Company

ATTN:

Mr. R. A. Watson

Senior Vice President

Nuclear Generation

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-261/92-11)

This refers to the inspection conducted by L. W. Garner of this

office on April 11 -

May 8, 1992.

The inspection included a

review of activities authorized for your H. B. Robinson facility.

At the conclusion of the inspection, the findings were discussed

with those members of your staff identified in the enclosed

inspection report.

Areas examined during the inspection are identified in the

report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

interviews with personnel, and observation of activities in

progress.

Based on the results of this inspection, certain of your

activities appeared to be in violation of NRC requirements, as

specified in the enclosed Notice of Violation (Notice). We are

concerned about the violation associated with the failure to

follow fire protection procedure FP-005 because it involved a

long standing work practice in the fire protection group which

had been undetected by your quality verification programs.

You are required to respond to this letter and should follow the

instructions specified in the enclosed Notice when preparing your

response. In your response, you should document the specific

actions taken and any additional actions you plan to prevent

recurrence. After reviewing your response to this Notice,

including your proposed corrective actions and the results of

future inspections, the NRC will determine whether further NRC

enforcement action is necessary to ensure compliance with NRC

regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of this letter, its enclosures, and any reply will be

placed in the NRC Public Document Room.

9206230088 920601

PDR ADOCK 05000261

a

PDR

JUN 0 1 12

Carolina Power and Light Co.

2

The responses directed by this letter and its enclosed Notice are

not subject to the clearance procedures of the Office of

Management and Budget as required by the Paperwork Reduction Act

of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please

contact us.

Sincerely,

opiG!INAL 9S1-r-'

y

DAVID M. VERRELU

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls:

C. R. Dietz, Vice President

Robinson Nuclear Project Department

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

R. H. Chambers, Plant General Manager

Robinson Nuclear Project Department

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC

29550

Heyward G. Shealy, Chief

Bureau of Radiological Health

Dept. of Health and Environmental Control

2600 Bull Street

Columbia, SC 29201

Dayne H. Brown, Director

Division of Radiation Protection

N.C. Department of Environment,

Health & Natural Resources

P. 0. Box 27687

Raleigh, N. C. 27611-7687

(cc w/encls cont'd -

See page 3)

Carolina Power and Light Co.

3

JUNO 11992

(cc w/encls cont'd)

McCuen Morrell, Chairman

Darlington County Board of Supervisors

County Courthouse

Darlington, SC

29535

Mr. H. Ray Starling

Manager -

Legal Department

P. O. Box 1551

Raleigh, NC 27602

H. A. Cole

Special Deputy Attorney General

State of North Carolina

P.O. Box 629

Raleigh, NC

27602

Robert Gruber

Executive Director

Public Staff -

NCUC

P. 0. Box 29520

Raleigh, NC

27626-0520

James L. Harrison

Manager, Regulatory Compliance

H. B. Robinson Steam Electric Plant

P. O. Box 790

Hartsville, SC 29550

bcc w/encls:

H. Christensen RII

B. Mozafari, NRR

NRR Document Control Desk

NRC Resident Inspector

U. S. Nuclear Regulatory Commission

Route 5, Box 413

Hartsville, S.C. 29550

RII:DRP

RII:DRP

RCarroll:tj

HChristensen

06/

/92

06/ ( /92