Forwards Insp Rept 50-261/92-02 on 920114-0207 & Notice of Violation.Nrc Concerned About Violation Because Personnel Failed to Recognize Effect That Substituting Test Methodology Would Have on Containment Isolation Valves
ML14178A191
Person / Time
Site: Robinson 
Issue date: 02/25/1992
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
Shared Package
ML14178A192 List:
References
NUDOCS 9203100024
Download: ML14178A191 (3)


See also: IR 05000261/1992002

Text

FES 2 5 199Z

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

ATTN:

Mr. Lynn W. Eury

Executive Vice President

Power Supply

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-261/92-02)

This refers to the inspection conducted by L. W. Garner of this office on

January 14,

1992 -

February 7, 1992.

The inspection included a review of

activities authorized for your H. B. Robinson facility.

At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during -the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records,

interviews with personnel,

and observation of

activities in progress.

Based on the results of this inspection, certain of your activities appeared to

be in violation of NRC requirements,

as specified in the enclosed Notice of

Violation (Notice).

We are concerned about the violation because personnel

failed to recognize the effect that substituting a test methodology other than

that specified in inservice test procedures would have on the operability of

primary sample containment isolation valves.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosure(s) will be placed in the NRC Public Document

Room.

921031000-4 c?

-125

PDR

ADOCDk 05000261

PDR

FES -2 5 19 2

Carolina Power and Light Company

2

The responses directed by this letter and its enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

OIGINAr siGND sy

DAVID M. VERRELLI

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls:

C. R. Dietz, Vice President

Robinson Nuclear Project Department

H. B. Robinson Steam Electric Plant

P.

0.

Box 790

Hartsville, SC

29550

R. H. Chambers, Plant General Manager

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC

29550

Heyward G. Shealy, Chief

Bureau of Radiological Health

Dept. of Health and Environmental

Control

2600 Bull Street

Columbia, SC 29201

Dayne H. Brown, Director

Division of Radiation Protection

N. C. Department of Environment,

Health & Natural Resources

P. 0. Box 27687

Raleigh, NC 27611-7687

(cc w/encls cont'd -

See page 3)

Carolina Power and Light Company

3

FEB 2 5 lusz

(cc w/encl cont'd)

McCuen Morrell, Chairman

Darlington County Board of Supervisors

County Courthouse

Darlington, SC 29535

H. Ray Starling

Manager -

Legal Department

Carolina Power and Light Co.

P. 0. Box 1551

Raleigh, NC 27602

H. A. Cole

Special Deputy Attorney General

State of North Carolina

P. 0. Box 629

Raleigh, NC 27602

Robert Gruber

Executive Director

Public Staff -

NCUC

P. 0. Box 29520

.

Raleigh, NC 27626-0520

J. D. Kloosterman, Director

Regulatory Compliance

H..B. Robinson Steam

Electric Plant

P. 0. Box 790

Hartsville, SC 29550

bcc w/encls:

J. Johnson, RH

H. Christensen, RH

R. Lo, NRR

Document Control Desk

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 5, Box 413

Hartsville, SC 29550

RII:DRP

HCh

stesen:tj

02/4/92