ML14178A114

From kanterella
Jump to navigation Jump to search
Forwards Initial SALP Rept 50-261/91-10 Covering Jan 1990 to Mar 1991.Overall Plant Performance Very Good & Radiological Controls & Security Continued to Exhibit Superior Performance
ML14178A114
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/31/1991
From: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Eury L
CAROLINA POWER & LIGHT CO.
Shared Package
ML14178A116 List:
References
NUDOCS 9107080253
Download: ML14178A114 (4)


See also: IR 05000261/1991010

Text

IMAY 3 11991

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

ATTN: Mr. Lynn W. Eury

Executive Vice President

Power Supply

P. 0. Box 1551

Raleigh, NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/91-10

The

NRC Systematic Assessment of Licensee Performance

(SALP)

has been

completed for your H. B. Robinson facility.

The facility was evaluated for

the period January 1, 1990 through March 30,

1991.

The results of the

evaluation are documented in the enclosed Initial SALP Report.

This report

will be discussed with you at a public meeting to be held at H. B. Robinson

on June 11, 1991, at 1:00 p.m.

O

The performance of your H. B. Robinson facility was evaluated in the functional

areas of plant operations, radiological controls, maintenance/surveillance,

emergency preparedness,

security, engineering/technical support,

and safety

assessment/quality verification.

The assessment indicated that the overall

performance of H. B. Robinson was good and that radiological controls and

security continued to exhibit superior performance.

The SALP Board recommendations in plant operations, maintenance/surveillance,

emergency preparedness and engineering/technical support reflect the need for

increased management attention. The NRC recognizes the challenges management

faces in solving plant aging concerns.

Accordingly, these challenges warrant

increased attention and the timely implementation of the Technical Support

Improvement Plan.

Any comments you have concerning our evaluation of the performance of your

H. B. Robinson facility should be submitted to this office within 30 days

following the date of our meeting.

These comments will be considered in the

development of the Final SALP Report.

Your comments and a summary of our

meeting will be issued as an appendix to the Final SALP Report.

F~~~~~c

I

~r

Kc)()(_

I..R

Carolina Power and Light Company

3

MAY 311991

(cc cont'd)

Mr. H. Ray Starling

Manager -

Legal Department

P. 0. Box 1551

Raleigh, NC 27602

H. A. Cole

Special Deputy Attorney General

State of North Carolina

P. 0. Box 629

Raleigh, NC 27602

Robert Gruber

Executive Director

Public Staff -

NCUC

P. 0. Box 29520

Raleigh, NC

27626-0520

J. D. Kloosterman, Director

Regulatory Compliance

H. B. Robinson Steam

Electric Plant

P. 0. Box 790

Hartsville, SC 29550

bcc w/encl:

K. M. Carr, Chairman

T. M. Roberts, Commissioner

K. C. Rogers, Commissioner

J. R. Curtiss, Commissioner

J. M. Taylor, EDO

H. L. Thompson, Jr., EDO

J. F. Wechselberger, Regional

Coordinator, EDO

T. E. Murley, NRR

S. Varga, NRR

E. Adensam, NRR

R. Lo, NRR

F. Allenspach, SALP Coordinator, NRR

Regional Administrators, RI, RIII

RIV, and RV

K. Clark, RII,

PAO

D. Verrelli, DRP, RH

H. Christensen, DRP, RII

R. Carroll, DRP, RII

K. Landis, Chief, TSS

NRC Resident Inspector

(bcc w/encl continued - See page 4)

Carolina Power and Light Company

2

MAY 31 1991

Should you have any questions concerning this matter, we will be glad to

discuss them with you.

Sincerely,

(Original signed by LAReyes/for)

Stewart D. Ebneter

Regional Administrator

Enclosure:

Initial SALP Report

cc w/encl:

C. R. Dietz, Manager

Robinson Nuclear Project Department

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

J. J. Sheppard, Plant General Manager

'H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC

29550

Heyward G. Shealy, Chief

Bureau of Radiological Health

Dept. of Health and Environmental

Control

2600 Bull Street

Columbia, SC 29201

Dayne H. Brown, Director

Division of Radiation Protection

N. C. Department of Environment,

Health & Natural Resources

P. 0. Box 27687

Raleigh, NC 27611-7687

McCuen Morrell, Chairman

Darlington County Board of Supervisors

County Courthouse

Darlington, SC 29535

(cc continued -

See page 3)

Carolina Power and Light Company

4

MAY 311991

.(bcc w/encl cont'd)

DRS and DRSS Branch Chiefs,

and Section Chiefs

INPO

Vtocument Control Desk

RII:DRP

RII:DRP.

RII: RP

RII:DRP

RII:DRSS

RI

L' ner

H

istensen

DVerrelli

E rschoff

BM

ett

Julin

05Z9C,/91

05/,5/91

05/1191

05/75/91

05/ /91

05

a 91

NRR

NRR

RH:

.

RLo

HBerkow

hoan

05B 7/91

05/9M/91

0/31/91