Forwards Insp Rept 50-261/91-01 on 910111-0215 & Notice of Violation.Concerns Raised That Review &/Or Oversight Process Failed to Identify Inadequate Implemented Mod Acceptance Tests
ML14178A085
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/05/1991
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
Shared Package
ML14178A086 List:
References
NUDOCS 9103250205
Download: ML14178A085 (4)


See also: IR 05000261/1991001

Text

MAR05 1

Docket No:

50-261

License No:

DPR-23

Carolina Power and Light Company

ATTN:

Mr. Lynn W. Eury

Executive Vice President

Power Supply

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-261/91-01)

This refers to the inspection conducted by L. W. Garner of this office on

January 11 - February 15, 1991. The inspection included a review of activities

authorized for your H. B. Robinson facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

and representative records,

interviews with personnel,

and observation of

activities in progress.

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

Violation for failure to: specify adequate modification acceptance tests;

perform modification acceptance tests as specified; and to adequately

establish a procedure to perform required testing. We are concerned about the

violations because the review and/or oversight processes failed to identify

the inadequately established and implemented modification acceptance tests and

the inadequate calibration procedure.

Furthermore,

as described in the inspection report, we are concerned about the

implementation of your corrective action program which failed to ensure your

commitment was met to have a Plant Specific Technical Guideline completed by

September 28,

1990.

Consequently, your response should describe those

particular actions taken or planned to improve the effectiveness of your

programs.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

910::250205 910305

PDR

ADOCK 05000261

I0

PDR

Carolina Power and Light Company

2

MAR 0511991

Notice, including your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

necessary to ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosure are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

D)AVID K.

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

cc w/encls:

C. R. Dietz, Manager

Robinson Nuclear Project Department

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

J. J. Sheppard, Plant General Manager

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC 29550

Heyward G. Shealy, Chief

Bureau of Radiological Health

Dept. of Health and Environmental

Control

2600 Bull Street

Columbia, SC 29201

(cc w/encls continued -

See page 3)

(II

Carolina Power and Light Company

3

MAR 05 1991

(cc w/encls cont'd)

Dayne H. Brown, Director

Division of Radiation Protection

N. C. Department of Environment,

Health & Natural Resources

P. 0. Box 27687

Raleigh, NC

27611-7687

McCuen Morrell, Chairman

Darlington County Board of .Supervisors

County Courthouse

Darlington, SC 29535

Richard E. Jones, General Counsel

Carolina Power and Light Company

P. 0. Box 1551

Raleigh, NC

27602

H. A. Cole

Special Deputy Attorney General

State of North Carolina

P. 0. Box 629

Raleigh, NC 27602

Robert Gruber

Executive Director

Public Staff -

NCUC

P. 0. Box 29520

Raleigh, NC

27626-0520

J. D. Kloosterman, Director

Regulatory Compliance

H. B. Robinson Steam

Electric Plant

P. 0. Box 790

Hartsville, SC 29550

bcc w/encls:

(See page 4)

Carolina Power and Light Company

4

bcc w/encls:

L-locument Control Desk

H. Christensen, RII

R. Lo, NRR

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 5, Box 413

Hartsville, SC 29550

.

RII:DRP

RII:D

RCarroll

HChr,% tensen

03/-, /91

03/5' /91