OFFICIAL USE ONLY SECURITY RELATED INFORMATION William R. Gideon Site Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555..0001 June 27, 2014 H. B. Robinson Steam Electric Plant Duke Energy Progress 3581 West Entrance Road Hartsville, SC 29550
SUBJECT:
H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2-STAFF ASSESSMENT OF THE FLOODING WALKDOWN REPORT SUPPORTING IMPLEMENTATION OF NEAR-TERM TASK FORCE RECOMMENDATION 2.3 RELATED TO THE FUKUSHIMA DAI-ICHI NUCLEAR POWER PLANT ACCIDENT (TAC NO.
MF0273)
Dear Mr. Gideon:
On March 12, 2012, the U.S. Nuclear Regulatory Commission (NRC) issued a request for information letter per Title 10 of the Code of Federal Regulations, Section 50.54(f) (50.54(f) letter). The 50.54(f) letter was issued to power reactor licensees and holders of construction permits requesting addressees to provide further information to support the NRC staff's evaluation of regulatory actions that may be taken in response to lessons learned from Japan's March 11, 2011, Great Tohoku Earthquake and subsequent tsunami. The request addressed the methods and procedures for nuclear power plant licensees to conduct flooding hazard walkdowns to identify and address degraded, nonconforming, or unanalyzed conditions through the corrective action program, and to verify the adequacy of the monitoring and maintenance procedures.
By letter dated November 26, 2012, Duke Energy Progress, Inc. submitted a Flooding Walkdown Report as requested in Enclosure 4 of the 50.54(f) letter for the H. B. Robinson Steam Electric Plant, Unit 2 site. By letter dated January 30, 2014, Duke Energy Progress, Inc.
provided a response to the NRC request for additional information for the staff to complete its assessments.
The NRC staff reviewed the information provided and, as documented in the enclosed staff assessment, determined sufficient information was provided to be responsive to Enclosure 4 of the 50.54(f) letter.
Enclosure transmitted herewith contains sensitive unclassified information. When Separated from Enclosure, this document is decontrolled.
OFFICIAL USE ONLY SECURITY RELATED INFORMATION
OFFICIAL USE ONLY SECURITY RELATED INFORMATION If you have any questions, please contact me at (301) 415-2760 or by e-mail at Martha. Barillas@nrc.gov.
Docket No. 50-261
Enclosure:
Staff Assessment of Flooding Walkdown Report cc wlo encl: Distribution via Listserv Sincerely, Martha Barillas, Project Manager Plant licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation OFFICIAL USE ONLY SECURITY RELATED INFORMATION
Non-Public L TR ML141768075 Public L TR ML141768089 b
"I concurrence,y e-ma1 OFFICE DORLILP2-2/PM JLD/PMB/PM DORL!LPL2-2/LA NAME MBarillas (AKiett for)
RKuntz (GEM iller for)
BCiayton
- DATE 6/27/14 6/27/14 6/27/14 OFFICE DSENRHM2*
DORLILPL2-2/BC(A)
DORL/LPL2-1/PM NAME RKaras LRegner MBarillas (AKiett for}
- DATE 5/14/2014 6/27/14 6/27/14