ML14176A826

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/89-29 on 891204-08 & Notice of Violation.Notice of Violation & Rept Details Withheld (Ref 10CFR2.790(d) & 73.21)
ML14176A826
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/12/1990
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Eury L
Carolina Power & Light Co
Shared Package
ML14176A827 List:
References
NUDOCS 9001220214
Download: ML14176A826 (3)


See also: IR 05000261/1989029

Text

  • 0JAN12Z

1980

Docket No.

50-261

License No. DPR-23

Carolina Power and Light Company

ATTN:

Mr. Lynn W. Eury

Executive Vice President

Power Supply

P. 0. Box 1551

Raleigh, NC

27602

SrFE

.

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NO. 50-261/89-29)

This refers to the Nuclear Regulatory Commission (NRC)

inspection conducted by

W. Tobin on December 4-8, 1989. The inspection included a review of activities

authorized for your H. B. Robinson facility.

At the conclusion of the

inspection,

the findings were discussed with those members of your staff

identified in the enclosed Inspection Report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consistedof selective examinations of procedures

and representative records, interviews with personnel,

and observation of

activities in progress.

The inspection findings indicate that certain activities appeared to violate

NRC requirements.

The violation, references to pertinent requirements,

and

elements to be included in your response are described in the enclosed Notice

of Violation.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure. Therefore, the enclosures

to this letter with the exception of the report cover page, which presents a

nonexempt summary, will not be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, Pub. L. No.96-511.

5C)0 (:)1

P.C1I'.-

Carolina Power and Light Company

2

Should you have any questions concerning this letter, please contact us.

Sincerely,

William E. Cline, Chief

Nuclear Materials Safety and

Safeguards Branch

Division of Radiation Safety

and Safeguards

Enclosures:

1. Notice of Violation

(Safeguards Information)

2. NRC Inspection ReDort

(Safeguards Information)

cc w/enc1s:

C. R. Dietz, Manager

Robinson Nuclear Project Department

H. B. Robinson Steam Electric Plant

P. 0.

Box 790

Hartsville, SC

29550

R. E. Morgan, Plant General Manager

H. B. Robinson Steam Electric Plant

P. 0. Box 790

Hartsville, SC

29550

cc w/Inspection Summary:

Dayne H. Brown, Chief

Radiation Protection Branch

Division of Facility Services

N. C. Department of Human Resources

701 Barbour Drive

Raleigh, NC 27603-2008

McCuen Morrell, Chairman

Darlington County Board of Supervisors

County Courthouse

Darlington, SC

29535

Richard E. Jones, General Counsel

Carolina Power and Light Company

P. 0. Box 1551

Raleigh, NC 27602

(cc w/Inspection Summary cont'd -

See page 3)

Carolina Power antd Light Company

3

(cc w/Inspection Summary cont'd)

H. A. Cole

Special Deputy Attorney General

State of North Carolina

P. 0. Box 629

Raleigh, NC

27602

Avery Upchurch, Chairman

Triangle J Council of Governments

100 Park Drive

P. 0. Box 12276

Research Triangle Park, NC

27709

Robert Gruber

Executive Director

Public Staff -

NCUC

P. 0. Box 29520

Raleigh, NC

27626-0520

State of South Carolina

bcc w/Inspection Summary:

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

Route 5, Box 413

Hartsville, SC

29550

bcc w/encls:

NRR/DRIS/SB

bcc w/Inspection Summary:

Document Control Desk (RIDS IE04), 016

RII:DRSS

R..I -SS

R.

SS

Rfl WSS

RII:DRP

WTobin:se

ATillman

DThompson

c uire

HDance

01/

/90

01/l /90

01//l /90

01//) /90

01/rI /90