ML14176A719
ML14176A719 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 01/29/1982 |
From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
Shared Package | |
ML14176A721 | List: |
References | |
NUDOCS 8202220320 | |
Download: ML14176A719 (2) | |
Similar Documents at Robinson | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML14314A7831999-10-0808 October 1999
[Table view]Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 2 & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next 5 Months ML14314A7771999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Slide Presentations & List of Questions Received from Participants Encl ML20211G9851999-08-26026 August 1999 Ltr Contract:Task Order 244 Entitled, Technical Assistance in Evaluating Proposed Increase in Allowed Ultimate Heat Sink Temperature of Hb Robinson,Unit 2, Under NRC-03-95-026 ML14314A7731999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at Hb Robinson.Requests Info Re Individuals Who Will Take Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML14183A9351999-08-0303 August 1999 Discusses 990731 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3.7.8.Staff Plans to Complete Review & Issue License Amend within 4 Wks of Date of Ltr ML14183A9271999-07-26026 July 1999 Forwards SE Re Relief Requests from ASME Section XI Requirements for Containment Insp ML14181A4481999-07-0707 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Revision 2.This Closes Staff Efforts to TAC MA0566 ML20206Q5281999-05-17017 May 1999 Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc ML14182A3031999-05-11011 May 1999 Forwards Insp Rept 50-261/99-02 on 990228-0410.One Violation Occurred & Being Treated as non-cited Violation ML14314A7651999-05-11011 May 1999 Summarizes 990504 Meeting Re PPR Results for Feb 1997 to Feb 1999.List of Attendees Encl ML14314A7631999-05-0707 May 1999 Informs That During 990505 Telcon Between T Natale & M Ernstes,Arrangements Were Made for Administration of Licensing Examinations at Hb Robinson Steam Electric Plant During Week of 990726 ML14182A3001999-05-0606 May 1999 Forwards Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified in Access Authorization Program & NRC Continuing Review of Issues.Notice of Violation Not Presently Issued ML14314A7561999-04-14014 April 1999 Confirms Telephone Conversation Between R Warden & G Macdonald on 990412 Re PPR Scheduled for 990504.Purpose of Meeting Will Be to Discuss Recently Completed PPR at Hb Robinson Unit 2 ML14314A7611999-04-0909 April 1999 Informs That on 990317,A Williams & Ho Christensen Confirmed That No Initial Licensing Exam Scheduled for Year 2000. Initial Exams Requested for March 2001 for Approx 12 Candidates RA-99-0071, Forwards Rev 7 to Training & Qualification Plan & Rev 1 to Physical Security & Safeguards Contingency Plan for HBR2,per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld1999-04-0101 April 1999 Forwards Rev 7 to Training & Qualification Plan & Rev 1 to Physical Security & Safeguards Contingency Plan for HBR2,per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld ML14314A7521999-03-11011 March 1999 Informs That During 990309 Telcon Between T Natale & M Ernstes,Arrangements Were Made for Administration of Licensing Exam at Plant During Wk of 990726.Copies of Proposed Exam Outlines Should Be Provided by 990513 ML20210J5761999-03-0404 March 1999 Requests Route re-approval for Rail Transportation Routes, Previously Approved by NRC by Ltr .Two Routes Requested to Be Reapproved,Rail Route 130 & 135.Util Requests That NRC Renew Route Approvals by 990416 ML14183A8911999-03-0101 March 1999 Refers to CP&L 970128 & 990219 Responses to GL 96-06, Assurance of Equipment Operability & Containment Integrity During DBA Conditions. Determined Submittals Acceptable for Resolving Issue of Thermally Induced Pressurization Piping ML14178B2001999-02-0808 February 1999 Refers to Telcon on 990127 When Mutually Agreeable Date of 990205 Was Established for CP&L to Provide USNRC with Addl Info Re IPEEE Site Audit.Informs That Required Info Had Not Been Received as of 990208 ML14183A8891999-02-0505 February 1999 Ack Receipt of Revising Earlier Commitment to Submit Proposed Change to Ultimate Heat Sink Temp Ts,From mid-December 1998 to 990527 ML14314A7451999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam RA-99-0011, Requests Change to HBR2 Physical Security & Safeguards Contingency Plan,Per 10CFR50.90.Change Involves Staffing & Location of Plant Security Force as Described in Encl.Encl Withheld1999-01-15015 January 1999 Requests Change to HBR2 Physical Security & Safeguards Contingency Plan,Per 10CFR50.90.Change Involves Staffing & Location of Plant Security Force as Described in Encl.Encl Withheld ML14183A8841999-01-14014 January 1999 Informs of Status of Review of Licensing Actions That Are Required to Support Plant Refueling Outage Number 19 ML14178B1891999-01-14014 January 1999 Informs That on 990117,Region II Will Implement Staff Reorganization as Part of agency-wide Streamlining Effort. Forwards Copy of Organization Charts for Info ML14183A8851999-01-13013 January 1999 Informs That NRC Did Not Receive Requested Info on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Hb Robinson Steam Electric Plant,Unit 2 ML14181B0311999-01-0808 January 1999 Forwards Safeguards Insp Rept 50-261/98-13 on 981207-11.No Violations Noted.Details of Rept Withheld Per 10CFR73.21 ML14183A8831998-12-29029 December 1998 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Motor-Operated Valves ML14314A7401998-12-23023 December 1998 Provides Summary of Training Managers Conference Conducted on 981105.Forwards Agenda,List of Attendees,Handouts & Preliminary Scheduled for FY99 & FY00.Goal of Providing Open Forum for Operator Licensing Issues Met ML14314A7371998-12-0101 December 1998 Provides Summary of 981119 Meeting with CP&L at Region II Ofc Re Configuration Mgt Initiatives & Design Control Organization Changes & Effectiveness of Corporate Support Organization.List of Meeting Attendees & Handouts Encl ML14314A7361998-11-25025 November 1998 Advises of Planned Insp Effort Resulting from Insp Planning Meeting on 981102.Insp Plan for Next 4 Months & Historical Listing of Plant Issues,Called Plant Issues Matrix, Encl ML14183A8771998-11-13013 November 1998 Discusses Closeout of TAC M98709 Re Request for Exemption from 10CFR70.24(a), Criticality Accident Requirements ML14314A7351998-11-12012 November 1998 Informs That on 981007,NRC Administered Gfes of Written Operator Licensing Examinations.Copies of Both Forms of Exam Including Answer Keys,Grading Results for Facility & Copies of Individual Answer Sheets Encl.Without Encl ML14314A7251998-10-30030 October 1998 Discusses Meeting with Util Conducted on 981020 in Rockville,Md Re Realistic Large Break loss-of-coolant Accident Methodology at Plant ML14314A7261998-10-27027 October 1998 Confirms Telcon on 981016 Re Meeting Requested to Discuss Issues Related to Configuration Mgt,Changes in Engineering Design Control Organization & Effectiveness of Corporate Support.Meeting Has Been Scheduled for 981119 ML14183A8731998-10-15015 October 1998 Forwards SER of Util Responses Re USI A-46 Implementation at Hb Robinson Steam Electric Plant,Unit 2 in Resolution of Unresolved Safety Issue as Described in Suppl 1 to GL 87-02. Staff Determined That C/As & Physical Mods,Satisfactory ML14314A7241998-10-0909 October 1998 Extends Invitation to Attend Training Conference on 981105 in Atlanta,Georgia.Conference Designed to Inform Regional Training & Operations Mgt of Issues & Policies That Affect Licensing of Reactor Plant Operators ML15026A1971998-09-23023 September 1998 Forwards NRC Review of Licensee 960513,970303 & 0425 Responses to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment, ML14178B1621998-09-14014 September 1998 Forwards RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetration, Concerning Responses for Plant & WOG Integrated Program for Assessment of W Designed Head Penetration Nozzles RA-98-0153, Transmits Description of Rev 0 to Physical Security & Safeguards Contingency Plan, Which Contains Plant Industrial Security Plan & Safeguards Contingency Plan,Per 10CFR72.44(e)1998-08-27027 August 1998 Transmits Description of Rev 0 to Physical Security & Safeguards Contingency Plan, Which Contains Plant Industrial Security Plan & Safeguards Contingency Plan,Per 10CFR72.44(e) ML14181A4341998-08-26026 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Novs. Licensee NOV Responses Which Accept Violations & Require No Addl Communication to Be Ack in Cover Ltr of Next Insp Rept ML14314A7181998-08-11011 August 1998 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 981007. Ltr Should Be Submitted Identifying Individuals Scheduled to Take exam,30 Days Prior to Exam Date RA-98-0136, Forwards Rev 0 to Physical Security & Safeguards Contingency Plan, for Hb Robinson Steam Electric Plant,Iaw 10CFR50.54(p)(2) & 50.4(b)(4).Summary of Changes Contained in Attachment 1.Plan Withheld,Per 10CFR73.211998-07-17017 July 1998 Forwards Rev 0 to Physical Security & Safeguards Contingency Plan, for Hb Robinson Steam Electric Plant,Iaw 10CFR50.54(p)(2) & 50.4(b)(4).Summary of Changes Contained in Attachment 1.Plan Withheld,Per 10CFR73.21 IR 05000261/19980051998-07-16016 July 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/98-05 ML20236J9871998-06-24024 June 1998 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety RA-98-0115, Forwards Rev 36 to Industrial Security Plan for Unit 2.Rev Withheld,Per 10CFR73.211998-06-18018 June 1998 Forwards Rev 36 to Industrial Security Plan for Unit 2.Rev Withheld,Per 10CFR73.21 ML14181B0111998-06-0202 June 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/98-03 Issued on 980304.Examples 4,6,12,13 & 14 of Violation B & Example 1 of Violation D,Withdrawn ML14183A8601998-05-15015 May 1998 Forwards Request for Addl Info Re Util 980106 Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps ML14183A8591998-05-12012 May 1998 Forwards RAI Re Request for Staff Review of Spent Fuel Cask Drop Unit 2 ML14314A7091998-05-0808 May 1998 Forwards Revised NRC Form 396 (3-1998), Certification of Medical Exam by Facility Licensee. Form Revised to Reflect Current Operator Licensing Policy as Noted.W/O Encl ML20217P4601998-05-0101 May 1998 Forwards ERDS Implementation Documents Including Data Point Library Updates for Robinson (Number 248),Peach Bottom (Number 249),Surry (Number 250),Crystal River (Number 251), McGuire (Numbers 252 & 254) & Salem (Number 253).W/o Encl 1999-09-01 Category:NRC TO UTILITY MONTHYEARML20058H9681990-11-20020 November 1990
[Table view]Forwards Insp Rept 50-261/90-24 on 901029-1102 & Notice of Violation IR 05000261/19900201990-11-16016 November 1990 Ack Receipt of Re Violations Noted in Insp Rept 50-261/90-20 ML14183A4551990-10-24024 October 1990 Forwards Ref Matl Requirements,Administration of Requalification Exams & NRC Rules & Guidance for Examinees ML14184A7471990-10-12012 October 1990 Requests That Analysis of Liquid Samples Spiked W/ Radionuclides Be Completed as Soon as Practicable But No Later than 60 Days from Receipt of Samples ML14184A7391990-09-24024 September 1990 Advises That Programmed Enchancements for Generic Ltr 88-17, Loss of DHR, Acceptable.Review of Remainder of Responses Will Be Accomplished as Insp Under Temporary Instruction 2515/103 in NRC Insp Manual ML20059M1731990-09-13013 September 1990 Forwards Summary of 900806 Meeting in Atlanta,Ga Re Corporate Emergency Preparedness & Recent Drill Performance. List of Attendees & Viewgraphs Encl ML14176A9041990-09-10010 September 1990 Forwards Insp Rept 50-261/90-18 on 900813-17.Violations Noted But Not Cited ML14176A8931990-08-0606 August 1990 Forwards Insp Rept 50-261/90-15 on 900710-13.No Violations or Deviations Noted IR 05000261/19900111990-08-0303 August 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/90-11 ML14176A8981990-08-0303 August 1990 Forwards Insp Rept 50-261/90-14 on 900611-0710.No Violations or Deviations Identified ML14176A8821990-07-27027 July 1990 Forwards Insp Rept 50-261/90-13 on 900617-21 & Notice of Violation.Attention Directed to Commitment for Prompt Corrective Action,Drill to Demonstrate Effectiveness of Corrective Action & Mgt Meeting ML20059M8571990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML14176A8731990-06-0707 June 1990 Forwards Insp Rept 50-261/90-11 on 900411-0510 & Notice of Violation.Violation Similar to 880623 Notice of Violation ML20043B4301990-05-24024 May 1990 Approves 891215 Request for Approval of Route to Transport Spent Fuel by Rail from Hb Robinson Plant to Shearon Harris Plant.Summary of Local Enforcement Agency Capabilities & Safe Havens Encl IR 05000261/19900081990-05-22022 May 1990 Forwards Corrected Page of Insp Rept 50-261/90-08, Transmitted by .W/O Encl ML14188B7001990-05-10010 May 1990 Advises That NRC Has No Position on Merits of Complaints Concerning Defective Westinghouse Steam Generators.Util Reminded of Responsibilities Under 10CFR21,50.72 & 50.73 for Review & Reporting of Defects in safety-related Matl to NRC IR 05000261/19900021990-04-30030 April 1990 Ack Receipt of 900409 Response Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/90-02.NRC Understands That Supplemental Response Will Be Issued on 900511 to Address Addl Actions to Be Taken ML14188B6941990-04-24024 April 1990 Provides Info Re Interpretation of Bioassay Measurements to Assess Intakes of Radioactive Matl.Memo Updating Position Taken in Info Notice 82-18, Interpretation of Bioassay Measurements;Assessment of Intakes Encl IR 05000261/19890111990-04-18018 April 1990 Ack Receipt of 900406 Supplemental Response Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/89-11.Grants Extensions Periods Requested ML14176A8511990-04-0505 April 1990 Forwards Insp Rept 50-261/90-04 on 900319-23.No Violations or Deviations Noted ML14188B6891990-04-0202 April 1990 Forwards SER Granting Relief from Section XI of ASME Code for Certain Items of Reactor Vessel,Pressurizer,Steam Generator Cladding & Regeneration HX Welds,Per 890201 Request ML20033G7901990-03-23023 March 1990 Forwards SALP Rept 50-261/89-30 for Nov 1988 - Dec 1989. Weaknesses Noted in Procedure Adherence.Improvements Noted in Emergency Preparedness & Radiological Controls.Mixed Performance Noted in Engineering/Technical Support ML14191A4381990-03-22022 March 1990 Forwards Request for Addl Info Re 870817 Request to Change Expiration Date of License.Addl Info Should Be Provided within 90 Days of Ltr Receipt ML14188B6821990-03-20020 March 1990 Presents NRC Understanding of Status of Current Unimplemented USIs at Facility,Per Generic Ltr 89-21 ML14176A8411990-03-0808 March 1990 Forwards Insp Rept 50-261/90-02 on 900111-0210 & Notice of Violation ML14176A8371990-02-14014 February 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/89-29 IR 05000261/19890231990-02-0909 February 1990 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/89-23.Agrees W/ Conclusion That Item C.1 of Notice Did Not Constitute Violation.Records Will Be Adjusted to Delete Item ML14188A7391990-02-0202 February 1990 Forwards Summary,List of Attendees & Util Handout from Mgt Meeting on 891228 Re Licensee Progress Towards Resolution of Problems & Technical Concerns Since Forced Outage of Facility in Aug 1989 Due to Auxiliary Feedwater Problems ML14176A8291990-02-0202 February 1990 Forwards Insp Rept 50-261/89-31 on 891205-06.No Violations or Deviations Noted ML20005H0991990-01-16016 January 1990 Informs of Temporary Rotational Assignment of Eg Adensam to Regional Ofc from 900108-0220.Author Will Be Acting Project Director During Adensam Absence ML14188A7311990-01-0808 January 1990 Forwards Corrected Page 4 to Notice of Violation & Proposed Imposition of Civil Penalty, ,based on 900103 Telcon ML14176A8231990-01-0808 January 1990 Forwards Insp Rept 50-261/89-25 on 891111-1215.No Violations or Deviations Noted.Unresolved Item Identified in Insp Rept Will Be Addressed During Future Insp ML14188A7251990-01-0404 January 1990 Ack Receipt of & Payment of Civil Penalty in Amount of $75,000,per NRC .Corrective Actions Will Be Examined During Future Insps IR 05000261/19890221989-12-29029 December 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/89-22 ML14176A8141989-12-19019 December 1989 Forwards Insp Rept 50-261/89-27 on 891113-16.No Violations or Deviations Noted.Three Exercise Weaknesses Discussed in Rept ML14176A8181989-12-18018 December 1989 Forwards Insp Rept 50-261/89-23 on 890815-18 & 0911-1110 & Notice of Violation IR 05000261/19890161989-12-18018 December 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/89-16 Re Emergency Operating Procedures IR 05000261/19892001989-12-0606 December 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/89-200. Responses Meet Requirements of 10CFR2.201 ML14188B6661989-12-0101 December 1989 Advises That 890525 Rev 22 to Emergency Plan Consistent W/Planning Stds of 10CFR50.47(b) & App E to 10CFR50 ML19332E7671989-11-28028 November 1989 Discusses 891017 Meeting in Region II Re Licensee Nuclear Prioritization Process & Status of Brunswick Simulator Upgrade.List of Attendees & Viewgraphs Encl ML14176A8031989-11-27027 November 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/89-11 ML19353B1461989-11-22022 November 1989 Advises That 891024 Rev 3 to Safeguards Contingency Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable for Inclusion Into Plan ML14188B6641989-11-22022 November 1989 Ack Receipt of 891031 60-day Response to Generic Ltr 88-20 Re Individual Plant Exam.Staff Will Document Acceptability of Plan & Schedule in Near Future ML14191A4211989-11-16016 November 1989 Forwards Safety Evaluation Accepting Util Response to Item 2.2.1 of Generic Ltr 83-27, Equipment Classification Program & EGG-NTA-7390, Conformance to Generic Ltr 83-28, Item 2.2.1 Equipment Classification for All Other.. IR 05000261/19890121989-10-0606 October 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/89-12 ML20248J0701989-10-0303 October 1989 Forwards Insp Rept 50-261/89-21 on 890911-15.No Violations or Deviations Noted ML14191A4141989-09-18018 September 1989 Forwards SER Re 880623 Request for Relief from ASME Code Requirements.Relief Request 15 for Alternative Exam Acceptable.Relief Requests 16-18 Denied Since Application Failed to Show Why Corresponding ASME Code Impractical ML14176A7671989-09-15015 September 1989 Forwards Insp Rept 50-261/89-20 on 890828-0901.No Violations Noted ML14176A7741989-09-14014 September 1989 Forwards Operational Safety Team Insp Rept 50-261/89-11 on 890710-28 & Notice of Violation ML14183A4451989-08-31031 August 1989 Advises That Reactor Operator & Senior Reactor Operator Written,Oral & Simulator/Operating Exams Scheduled for Wk of 891204.Requests That Util Furnish Approved Ref Matl Listed in Encl 1 by 890911 1990-09-24 Category:OUTGOING CORRESPONDENCE MONTHYEARML14314A7831999-10-0808 October 1999
[Table view]Informs That on 990930,NRC Staff Completed mid-cycle PPR of Plant,Unit 2 & Did Not Identify Any Areas in Which Performance Warranted More than Core Insp Program.Nrc Plan to Conduct Only Core Insps at Facility Over Next 5 Months ML14314A7771999-09-0101 September 1999 Informs That on 990812-13,Region II Hosted Training Managers Conference on Recent Changes to Operator Licensing Program. List of Attendees,Slide Presentations & List of Questions Received from Participants Encl ML20211G9851999-08-26026 August 1999 Ltr Contract:Task Order 244 Entitled, Technical Assistance in Evaluating Proposed Increase in Allowed Ultimate Heat Sink Temperature of Hb Robinson,Unit 2, Under NRC-03-95-026 ML14314A7731999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006 at Hb Robinson.Requests Info Re Individuals Who Will Take Exam,Personnel Who Will Have Access to Exam.Sample Registration Ltr Encl ML14183A9351999-08-0303 August 1999 Discusses 990731 Request That NRC Exercise Discretion Not to Enforce Compliance with Actions Required in TS 3.7.8.Staff Plans to Complete Review & Issue License Amend within 4 Wks of Date of Ltr ML14183A9271999-07-26026 July 1999 Forwards SE Re Relief Requests from ASME Section XI Requirements for Containment Insp ML14181A4481999-07-0707 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Revision 2.This Closes Staff Efforts to TAC MA0566 ML20206Q5281999-05-17017 May 1999 Responds to 990304 Request for Two Rail Routes to Be Used for Transport of Spent Fuel from Brunswick Steam Electric Plant,Southport,Nc & Hb Robinson Steam Electric Plant, Hartsville,Sc to Shearon Harris Npp,Near New Hill,Sc ML14182A3031999-05-11011 May 1999 Forwards Insp Rept 50-261/99-02 on 990228-0410.One Violation Occurred & Being Treated as non-cited Violation ML14314A7651999-05-11011 May 1999 Summarizes 990504 Meeting Re PPR Results for Feb 1997 to Feb 1999.List of Attendees Encl ML14314A7631999-05-0707 May 1999 Informs That During 990505 Telcon Between T Natale & M Ernstes,Arrangements Were Made for Administration of Licensing Examinations at Hb Robinson Steam Electric Plant During Week of 990726 ML14182A3001999-05-0606 May 1999 Forwards Insp Repts 50-261/99-10,50-324/99-10,50-325/99-10 50-400/99-10 on 990310,18,19 & 25.Five Apparent Violations Identified in Access Authorization Program & NRC Continuing Review of Issues.Notice of Violation Not Presently Issued ML14314A7561999-04-14014 April 1999 Confirms Telephone Conversation Between R Warden & G Macdonald on 990412 Re PPR Scheduled for 990504.Purpose of Meeting Will Be to Discuss Recently Completed PPR at Hb Robinson Unit 2 ML14314A7611999-04-0909 April 1999 Informs That on 990317,A Williams & Ho Christensen Confirmed That No Initial Licensing Exam Scheduled for Year 2000. Initial Exams Requested for March 2001 for Approx 12 Candidates ML14314A7521999-03-11011 March 1999 Informs That During 990309 Telcon Between T Natale & M Ernstes,Arrangements Were Made for Administration of Licensing Exam at Plant During Wk of 990726.Copies of Proposed Exam Outlines Should Be Provided by 990513 ML14183A8911999-03-0101 March 1999 Refers to CP&L 970128 & 990219 Responses to GL 96-06, Assurance of Equipment Operability & Containment Integrity During DBA Conditions. Determined Submittals Acceptable for Resolving Issue of Thermally Induced Pressurization Piping ML14178B2001999-02-0808 February 1999 Refers to Telcon on 990127 When Mutually Agreeable Date of 990205 Was Established for CP&L to Provide USNRC with Addl Info Re IPEEE Site Audit.Informs That Required Info Had Not Been Received as of 990208 ML14183A8891999-02-0505 February 1999 Ack Receipt of Revising Earlier Commitment to Submit Proposed Change to Ultimate Heat Sink Temp Ts,From mid-December 1998 to 990527 ML14314A7451999-02-0505 February 1999 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 990407. Representative of Facility Must Submit Either Ltr Indicating No Candidates or Listing of Candidates for Exam ML14183A8841999-01-14014 January 1999 Informs of Status of Review of Licensing Actions That Are Required to Support Plant Refueling Outage Number 19 ML14178B1891999-01-14014 January 1999 Informs That on 990117,Region II Will Implement Staff Reorganization as Part of agency-wide Streamlining Effort. Forwards Copy of Organization Charts for Info ML14183A8851999-01-13013 January 1999 Informs That NRC Did Not Receive Requested Info on GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Hb Robinson Steam Electric Plant,Unit 2 ML14181B0311999-01-0808 January 1999 Forwards Safeguards Insp Rept 50-261/98-13 on 981207-11.No Violations Noted.Details of Rept Withheld Per 10CFR73.21 ML14183A8831998-12-29029 December 1998 Forwards Request for Addl Info Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Motor-Operated Valves ML14314A7401998-12-23023 December 1998 Provides Summary of Training Managers Conference Conducted on 981105.Forwards Agenda,List of Attendees,Handouts & Preliminary Scheduled for FY99 & FY00.Goal of Providing Open Forum for Operator Licensing Issues Met ML14314A7371998-12-0101 December 1998 Provides Summary of 981119 Meeting with CP&L at Region II Ofc Re Configuration Mgt Initiatives & Design Control Organization Changes & Effectiveness of Corporate Support Organization.List of Meeting Attendees & Handouts Encl ML14314A7361998-11-25025 November 1998 Advises of Planned Insp Effort Resulting from Insp Planning Meeting on 981102.Insp Plan for Next 4 Months & Historical Listing of Plant Issues,Called Plant Issues Matrix, Encl ML14183A8771998-11-13013 November 1998 Discusses Closeout of TAC M98709 Re Request for Exemption from 10CFR70.24(a), Criticality Accident Requirements ML14314A7351998-11-12012 November 1998 Informs That on 981007,NRC Administered Gfes of Written Operator Licensing Examinations.Copies of Both Forms of Exam Including Answer Keys,Grading Results for Facility & Copies of Individual Answer Sheets Encl.Without Encl ML14314A7251998-10-30030 October 1998 Discusses Meeting with Util Conducted on 981020 in Rockville,Md Re Realistic Large Break loss-of-coolant Accident Methodology at Plant ML14314A7261998-10-27027 October 1998 Confirms Telcon on 981016 Re Meeting Requested to Discuss Issues Related to Configuration Mgt,Changes in Engineering Design Control Organization & Effectiveness of Corporate Support.Meeting Has Been Scheduled for 981119 ML14183A8731998-10-15015 October 1998 Forwards SER of Util Responses Re USI A-46 Implementation at Hb Robinson Steam Electric Plant,Unit 2 in Resolution of Unresolved Safety Issue as Described in Suppl 1 to GL 87-02. Staff Determined That C/As & Physical Mods,Satisfactory ML14314A7241998-10-0909 October 1998 Extends Invitation to Attend Training Conference on 981105 in Atlanta,Georgia.Conference Designed to Inform Regional Training & Operations Mgt of Issues & Policies That Affect Licensing of Reactor Plant Operators ML15026A1971998-09-23023 September 1998 Forwards NRC Review of Licensee 960513,970303 & 0425 Responses to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment, ML14178B1621998-09-14014 September 1998 Forwards RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetration, Concerning Responses for Plant & WOG Integrated Program for Assessment of W Designed Head Penetration Nozzles ML14181A4341998-08-26026 August 1998 Informs of Change Being Implemented by Region II Re Administrative Processing of Licensee Responses to Novs. Licensee NOV Responses Which Accept Violations & Require No Addl Communication to Be Ack in Cover Ltr of Next Insp Rept ML14314A7181998-08-11011 August 1998 Informs That NRC Plans to Administer Generic Fundamentals Exam Section of Written Operator Licensing Exam on 981007. Ltr Should Be Submitted Identifying Individuals Scheduled to Take exam,30 Days Prior to Exam Date IR 05000261/19980051998-07-16016 July 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/98-05 ML20236J9871998-06-24024 June 1998 First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety ML14181B0111998-06-0202 June 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/98-03 Issued on 980304.Examples 4,6,12,13 & 14 of Violation B & Example 1 of Violation D,Withdrawn ML14183A8601998-05-15015 May 1998 Forwards Request for Addl Info Re Util 980106 Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps ML14183A8591998-05-12012 May 1998 Forwards RAI Re Request for Staff Review of Spent Fuel Cask Drop Unit 2 ML14314A7091998-05-0808 May 1998 Forwards Revised NRC Form 396 (3-1998), Certification of Medical Exam by Facility Licensee. Form Revised to Reflect Current Operator Licensing Policy as Noted.W/O Encl ML20217P4601998-05-0101 May 1998 Forwards ERDS Implementation Documents Including Data Point Library Updates for Robinson (Number 248),Peach Bottom (Number 249),Surry (Number 250),Crystal River (Number 251), McGuire (Numbers 252 & 254) & Salem (Number 253).W/o Encl ML14181B0041998-04-27027 April 1998 Forwards Insp Rept 50-261/98-02 on 980215-0328.No Violations Noted.Insp Characterized by safety-conscious Operations, Sound Engineering & Maint Practices & Careful Radiological Work Controls IR 05000261/19980011998-04-20020 April 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-261/98-01 ML14183A8551998-04-14014 April 1998 Forwards RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Info Will Be Used in Updating Rv Integrity Database IR 05000261/19983001998-03-26026 March 1998 Forwards Exam Rept 50-261/98-300 Administered on 980223-26. NRC Resolution of post-exam Comments Encl IR 05000261/19970131998-03-25025 March 1998 Ack Receipt of Informing NRC of Steps Taken to Correct Exercise Weakness Noted in Insp Rept 50-261/97-13. Corrective Actions Planned Appear to Be Adequate.Actual Implementation of CA Will Be Reviewed During Future Insp ML20212H2391998-03-24024 March 1998 Forwards Insp Rept 50-261/98-04 on 980223-25.No Violations Noted.Physical Security Program for Power Reactors Was Inspected 1999-09-01 |
See also: IR 05000261/1981028
Text
YELLOW
JAN 2 9 1982
Carolina Power and Light Company
I
7Mpp
0g p
ATTN:
Mr. J. A. Jones, Senior Executive
Vice President and Chief
Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
Subject:
Report No. 50-261/81-28
This refers to the routine inspection conducted by Mr. C. McFarland of this
office on December 14-15, 1981, of activities authorized by NRC Operating License
No. DPR-23 for the H. B. Robinson facility and to the discussion of our findings
held with Mr. B. J. Furr, Vice President, Nuclear Operations, at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously inspection
findings.
The status of these items is discussed in the enclosed inspection
report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report No. 50-261/81-28
ccls see page 2
8202220320 820129
PDR ADOCK 05000261
Carolina Power & Light Company
2
JAN29 1982
cc w/encl:
R. B. Starkey, Jr., Plant Manager
bcc w/encl:
NRC Resident Inspector
Document Management Branch
State of South Carolina
OIE:
Division of Emergency
Preparedness
RII
RH
RII
RH
r
RI I
Rh ' (a
JPS/~
R C L
ew
)
1/16a
and:dt
RJenk s
C 1'an
Jio
RCtew8