ML14176A716
| ML14176A716 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 12/23/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14176A717 | List: |
| References | |
| NUDOCS 8201270678 | |
| Download: ML14176A716 (2) | |
See also: IR 05000261/1981032
Text
DEC 2 31981
Carolina Power and Light Company
ATTN: Mr. J. A. Jones, Senior Executive
Vice President and Chief
Operating Officer
'3
411 Fayetteville Street
N2
Raleigh, NC
27602
f
79
7
Gentlemen:
Subject:
Report No. 50-261/81-32
This refers to the routine safety inspection conducted by Mr. S. Weise of this
office on November 11 - December 10, 1981, of activities authorized by NRC
Operating License No. DPR-23 for the H. B. Robinson facility and to the
discussion of our findings held with Mr. R. B. Starkey, Plant General Manager, at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure(s)
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
of 2.790(b)(1).
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosure:
See page 2
8201270678811223
PDR ADOCK 05000261
G
PDRx
Carolina Power & Light Company
2
DEC23 1981
Enclosure:
Inspection Report No. 50-261/81-32
cc w/encl:
R. B. Starkey, Jr., Plant Manager
bcc w/encl:
NRC Resident Inspector
Document Management Branch
State of South Carolina
RII
RII
RII
R
SWe?- 6 t
CJul ian
CB
Lewis
12/23/ 1
12/z3/81
12/23/81
12/VfA81