SEP 1 1981
Carolina Power and Light Company
ATTN:
Mr. J. A. Jones, Senior Executive
Vice President and Chief
Operating Officer
C C
411 Fayetteville Street
Raleigh, NC
27602
IEHQFILECOPY
Gentlemen:
Subject: Report No. 50-261/81-21
This refers to the routine safety inspection conducted by Mr. P. R. Bemis of this
office on July 27-31, 1981, of activities authorized by NRC Operating License No.
DPR-23 for the H. B. Robinson facility and to the discussion of our findings held
with Mr. R. Starkey, Plant Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from dis
closure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office
by telephone within ten days from the date of this letter of your intention to
file a request for withholding; and (b) submit within twenty-five days from the
date of this letter a written application to this office to withhold such infor
mation. If your receipt of this letter has been delayed such that less than
seven days are available for your review, please notify this office promptly so
that a new due date may be established.
Consistent with section 2.790(b)(1),
such application must be accompanied by an affidavit executed by the owner of the
information which identifies the document or part thereof sought to be withheld,
and a full statement of the reasons on the basis of which it is claimed that the
information should be withheld from public disclosure.
This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, the report will be
placed in the Public Document Room.
8109240436 810901
PDR ADOCK 05000261
G
__
SEP 1 1981
Carolina Power and Light Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report No. 50-261/81-21
cc w/encl:
R. B. Starkey, Jr. , Plant Manager
bcc w/encl:
NRC Resident Inspector
Document Management Branch
State of South Carolina
RII
RH
1
RH
RH
RII
RII
RI
PRBemis:
' pright
CEMu phy
AFGibson
R
er
C
an
R Lewis
8/22/81
80f81
8
l 8 1
81/81
8/}/ 81
8/? /81
8/ /81