YELLOW
Carolina Power and Light Company
ATTN:
Mr. J. A. Jones, Senior Executive
Vice President and Chief
Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
.
Gentlemen:
Subject:
Report No. 50-261/81-18
This refers to .the routine inspection conducted by Mr. A. L. Cunningham of this
office on July 6-9, 1981, of activities authorized by NRC Operating License
DPR-23 for the H. B. Robinson facility and to the discussion of our findings held
with Mr. R. B. Starkey, Plant Manager at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established. Consistent with
section 2.790(b)(1), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit. If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
8109010068 910807
PDR ADOCK 05000261
PDR)
Carolina Power and Light Company
2
AUG 7
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
R. C. Lewis, Director
Division of Resident and
Reactor Project Inspection
Enclosure:
Inspection Report No. 50-261/81-18
cc w/encl:
R. B. Starkey, Jr., Plant Manager
bcc w/encl:
NRC Resident Inspector
Central Files
Local Public Document Room
Washington Public Document Room
Nuclear Safety Information Center
Technical Information Center
Document Management Branch
State of South Carolina
RII
RH
RI
RII
RI
ALCunningha :ej
DMMontgomery
R
er
OGJein
t r
Lewis
7/
G/81
7/ L/81
7/ /81
E7/81
9/1/81
A/ /81