MONTHYEARML24011A1002024-01-10010 January 2024 March 2024 Emergency Preparedness Program Inspection - Request for Information ML23334A1612023-11-30030 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - RAIs Associated with License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue ML23334A0072023-11-29029 November 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAIs for LAR That Revises TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating ML23298A1232023-10-25025 October 2023 NRR E-mail Capture - Palo Verde, Unit 1 - RAIs for Relief Request 70, Proposed Alternatives for Pressurizer Lower Shell Temperature Nozzle ML23243B0082023-08-31031 August 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23233A0132023-08-18018 August 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of License Renewal Commitment for Pressurizer Surge Line Welds Inspection Program to Manage Environmentally Assisted Fatigue ML23220A0512023-08-0303 August 2023 NRR E-mail Capture - Re Palo Verde 1, 2, and 3 - SUNSI Review of UFSAR, Rev. 22 ML23202A0162023-07-20020 July 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Revise TSs 3.5.1, SITs - Operating; 3.5.2, SIT Shutdown; 3.6.5, Containment Air Temperature; and SRs for TS 3.5.1, SITs Operating ML23143A1332023-05-23023 May 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR Revising TS 3.3.11 to Adopt TSTF-266-A, Rev. 3, Eliminate the Remote Shutdown System Table of Instrumentation and Controls ML23130A0132023-05-10010 May 2023 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for Authorized Use of Mururoa Supplied Air Suits (Models V4F1 and MTH2) Pursuant to 10 CFR 20.1703 and 10 CFR 20.1705 ML23017A0932023-01-17017 January 2023 NRR E-mail Capture - Palo Verde - Acceptance of License Amendment Request Regarding Adoption of TSTF-107, Separate Control Rods That Are Untrippable Versus Inoperable (L-2022-LLA-0181) ML23013A0632023-01-13013 January 2023 NRR E-mail Capture - Palo Verde Unit 1 -Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22348A1672022-12-14014 December 2022 March 2023 Emergency Preparedness Exercise Inspection - Request for Information ML22339A2372022-12-0505 December 2022 NRR E-mail Capture - Palo Verde Unit 1 Request for Additional Information - U1R23 Inspection Summary Report for Steam Generator Tubing ML22173A0682022-06-17017 June 2022 Email Concurrence on SE Input for Columbia Pltr LAR ML22167A1872022-06-16016 June 2022 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Revised Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML22136A0922022-05-16016 May 2022 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-487-A, Revision 1, Relocate DNB Parameters to the COLR ML22075A1902022-03-16016 March 2022 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR to Adopt TSTF-567, Add Containment Sump TS to Address GSI-191 Issues ML22055A5842022-02-24024 February 2022 NRR E-mail Capture - Palo Verde, Unit 3 - Final RAIs for 22nd Refueling Outage (Spring 2021) Steam Generator Tube Inservice Inspection Report ML22034A0132022-02-0202 February 2022 NRR E-mail Capture - Palo Verde, Unit 2 - Verbal Approval of RR-69 to Extend Containment Tendon Inspection from 2/8/22 to 6/8/22 ML22032A0312022-01-31031 January 2022 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for an Exemption Regarding Elimination of Dafas Using RIPE Process ML22025A4012022-01-0303 January 2022 March 2022 Emergency Preparedness Program Inspection - Request for Information ML21333A1982021-11-19019 November 2021 NRC Review of PVNGS Training Needs Analysis and Training Required by Condition I of the Confirmatory Order EA-20-054 ML21306A1882021-10-18018 October 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Second Pre-submittal Meeting for the Proposed Exemption to Eliminate Dafas Using RIPE Process ML21272A0592021-09-28028 September 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - SUNSI Review of UFSAR, Rev. 21 ML21264A1352021-09-17017 September 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Acceptance Review of LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21237A0762021-08-25025 August 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection ML21228A0082021-08-16016 August 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of an LAR for Administrative Changes to Technical Specifications ML21228A1042021-08-12012 August 2021 RR-67, Request for Alternative Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (EPID L-2021-LLR-0050) (Email) ML21237A5172021-08-10010 August 2021 Email to PV Licensee and Palo Verde Nuclear Generating Station, Units 1, 2 and 3 - Notification of Inspection of the Licensees Implementation Industry Initiative Associated with the Open Phase Condition (NRC Bulletin 2012-01) and Request Fo ML21160A1442021-06-0909 June 2021 NRR E-mail Capture - Palo Verde 1 and, 2 - Acceptance Review for Order Approving Transfers of Control of Licenses for Minority Interests Subject to Expiring Leases ML21154A0082021-05-26026 May 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Official RAIs for LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21146A3342021-05-14014 May 2021 ISFSI - Final Package for an Order Associated with Indirect Transfers of Control of Licenses from Pnm to Avangrid ML21132A2372021-05-12012 May 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3, and ISFSI - Final Package for an Order Associated with Indirect Transfers of Control of Licenses from Pnm to Avangrid ML21103A3632021-04-13013 April 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review for Indirect Transfer of Control of Licenses Pursuant to 10 CFR 50.80 and 10 CFR 72.50 ML21064A2372021-03-0303 March 2021 ISI Request for Information Rls ML21053A0262021-02-22022 February 2021 NRR E-mail Capture - Palo Verde 1, 2 and 3 - Acceptance Review of LAR Associated with Permanent Extension of Containment ILRT Frequency to 15 Years (Type a) and CIV Leak Rate Test Frequency to 75 Months (Type C) ML21043A1462021-02-11011 February 2021 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Official RAI for an Order Associated with Indirect License Transfer from Public Service Company of New Mexico to Avangrid, Inc ML21023A0212021-01-13013 January 2021 PVNGS PI&R Request for Information RA ML20366A1682020-12-31031 December 2020 NRR E-mail Capture - Palo Verde 1, 2, and 3, and ISFSI - Acceptance Review of an Order Associated with Indirect Transfers of Control of Licenses ML21005A2712020-12-29029 December 2020 102-08208 PVNGS Communication Required by Confirmatory Order EA-20-054 ML20325A0392020-11-19019 November 2020 NRR E-mail Capture - Palo Verde 2 - Verbal Authorization of RR 66 to Extend Containment Tendon Inspection by One Year Based on 10 CFR 50.55a(Z)(2) ML20316A0162020-11-0909 November 2020 NRR E-mail Capture - Palo Verde 2 - Acceptance Review of RR 66, Request Containment Post-Tensioning System Inspection One-Time by One Year Due to COVID-19 Pandemic ML20295A4912020-10-21021 October 2020 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of LAR Associated with Adopting TSTF-501, Relocate Stored Fuel Oil and Lube Oil Volumes to Licensee Control ML20265A0982020-09-21021 September 2020 NRR E-mail Capture - Palo Verde 1, 2, and 3 - Acceptance Review of License Amendment Associated with Making Necessary Administrative Changes to Technical Specifications ML20108E9462020-04-16016 April 2020 NRR E-mail Capture - (External_Sender) Clarification to PVNGS Part 26 Exemption Request (ML20105A481) ML20091K0752020-03-31031 March 2020 NRR E-mail Capture - Palo Verde 2 - Acceptance Review of RR 65, Request for Relief from RPV Bottom Mounted Instrumentation Nozzles and a Pressurizer Surge Line Weld Overlay Examination ML20091M1992020-03-31031 March 2020 NRR E-mail Capture - Palo Verde 2 - Verbal Authorization of RR 65, Request for Relief from RPV Bottom Mounted Instrumentation Nozzles and a Pressurizer Surge Line Weld Overlay ISI Examinations ML20050C9742020-02-19019 February 2020 NRR E-mail Capture - Palo Verde 1,2, and 3 - Framatome Htp Fuel LAR and Exemption Third Audit Summary (EPIDs L-2018-LLA-0194 and L-2018-LLE-0010) 2024-01-10
[Table view] |
Text
NRR-PMDAPEm Resource From: Rankin, Jennivine Sent: Tuesday, June 24, 2014 2:35 PM To: Thomas.N.Weber@aps.com Cc: Robert.Roehler@aps.com; Watford, Margaret
Subject:
Acceptance Review - Palo Verde Nuclear Generating Station, Relief Request 52 (MF4169)
Mr. Weber, By letters dated May 16, 2014 (Agencywide Documents Access and Management System (ADAMS)
Accession Nos. ML14142A029 and ML14141A545), Arizona Public Service Company (the licensee), submitted a request for relief (proposed alternative) from the American Society of Mechanical Engineers (ASME) Code,Section XI, flaw removal, flaw characterization and successive examinations requirements, for the Palo Verde Nuclear Generating Station, Unit 3. The proposed relief request, Relief Request 52, would provide relief from those requirements for the remainder of the Unit 3 licensed operating life.
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in the scope and depth to allow the NRC staff to complete its detailed technical review.
The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations, the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and to make an independent assessment regarding the acceptability of the requested relief in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
If you have any questions, please contact me at (301) 415-1530.
- Thanks, Jennie Jennie Rankin, Project Manager Palo Verde Nuclear Generating Station Fort Calhoun Station Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1
Hearing Identifier: NRR_PMDA Email Number: 1399 Mail Envelope Properties (Jennivine.Rankin@nrc.gov20140624143400)
Subject:
Acceptance Review - Palo Verde Nuclear Generating Station, Relief Request 52 (MF4169)
Sent Date: 6/24/2014 2:34:55 PM Received Date: 6/24/2014 2:34:00 PM From: Rankin, Jennivine Created By: Jennivine.Rankin@nrc.gov Recipients:
"Robert.Roehler@aps.com" <Robert.Roehler@aps.com>
Tracking Status: None "Watford, Margaret" <Margaret.Watford@nrc.gov>
Tracking Status: None "Thomas.N.Weber@aps.com" <Thomas.N.Weber@aps.com>
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 2729 6/24/2014 2:34:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: