ML14175B467

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/87-11 on 870411-0510.No Violations or Deviations Noted
ML14175B467
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 06/05/1987
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML14175B468 List:
References
NUDOCS 8706170006
Download: ML14175B467 (2)


See also: IR 05000261/1987011

Text

JUNO05 1987

Docket No:

50-261

License No:

DPR-23

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: REPORT NO. 50-261/87-11

This refers to the Nuclear Regulatory Commission (NRC)

inspection conducted by

H. E .P. Krug on April 11 - May 10, 1987. The inspection included a review of

activities authorized for your H. B. Robinson facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

.Areas

examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records,

interviews with personnel , and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(Original signed by P. Fredrickson for)

8706170006 870605

PDR ADOCK 05000261

David M. Verrelli, Chief

PDR

Reactor Projects Branch 1

Division of Reactor Projects

.

Enclosure:

NRC Inspection Report

cc w/encl: (See page 2)

7g

/

JUN 05 19871

Carolina Power and Light Company

2

cc w/encl:

G. P. Beatty, Jr., Vice President

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager

bcc w/encl:

Document Control Desk

State of North Carolina

NRC Resident Inspector

)

RI

RII

SVias:cc

PFr dr4 ckson

6/1

/87

/87