DEC 0 9 19
Docket No. 50-261
License No. DPR-23
Carolin/Power and Light Company
ATTN: %Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/86-28)
This refers to the Nuclear Regulatory Commission
(NRC)
inspection conducted by
Harry E. P. Krug on October 11 -
November 10,
1986.
The inspection included a
review of activities authorized for your H. B. Robinson facility.
At the
conclusion of the inspection, the findings were discussed with those members of
your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas,
the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements. The violation, reference to pertinent requirements, and elements to
be included in your response are presented in the enclosed Notice of Violation.
In accordance -with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
3612150379
61209
Original Signed by
ADC
05000261
Luis A. Reyes
/for
D
APDR
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
(See page 2)
Carolina Power and Light Company
2
DEC0 91986
Enclosures:
2. NRC Inspection Report
I w/encls:
P. Beatty, Jr., Manager
obinson Nuclear Project Department
ie.E. Morgan, Plant General Manager
bcc w/encls:
. Cobb,
SMPB
C Resident Inspector
Document Control Desk
State of North Carolina
SRII
RII
RIIJ
LMell1'ncdg
PFretrickson
Dferrelli
Il1/(//86
4/-
f/86
1 / /86