ML14175B430
| ML14175B430 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 09/30/1986 |
| From: | Verrelli D NRC/IE, NRC/RGN-II |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14175B431 | List: |
| References | |
| NUDOCS 8610100214 | |
| Download: ML14175B430 (2) | |
See also: IR 05000261/1986025
Text
SAFEGUARDS INFORMATION
SEP 3 0 1986
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-261/86-25
This refers to the Nuclear Regulatory Commission
(NRC)
inspection conducted by
Jerry D. Ennis on September 8-12,
1986.
The inspection included a review of
activities authorized for your H. B. Robinson facility. At the conclusion of the
inspection,
the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas,
the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21,
safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosure to
this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
83610100214 860930
ADOCK 05000261
David M. Verrelli, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
NRC Inspection Report
.
(Safeguards Information)
cc w/encl:
(See page 2)
ENCLOSEMCCONTMAgag
SARGUAJhi IFlORMATIotl
UPON SEPARATON Tays
PAGE IS DECONTROLLED-,
SAFEGUARDS INFORMATION
-w-1'
SAFEGUARDS INFORMATION
Carolina Power and Light Company
2
S EP 3 0 1986
(cc w/encl cont'd:)
G. P. Beatty, Jr., Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
bcc w/encl:
IE File
NMSS/SGPL
NRR/DL/SSPB
bcc w/Inspection Summary:
NRC Resident Inspector
Document Control Desk, 016
State of South Carolina
RII
RI
RI
RI
ihis:hm
G&uire
EMcAlpine
/
ohr
PFrqdrickson
9/2,C/86
9/
)
86
9/ 3o/86
9/
6
9
1/86
"
1 3 f
O T XC
SAFEGUARDS qNFORWCAfLEON
CONTAIW
PAGE 18 DECONTROLS.