ML14175B418
| ML14175B418 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 09/12/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML14175B419 | List: |
| References | |
| NUDOCS 8609190162 | |
| Download: ML14175B418 (2) | |
See also: IR 05000261/1986024
Text
SAFEGUARDS INFORMATiON
SEP 1,21986
Docket No. 50-261
License No. DPR-23
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NO. 50-261/86-24)
This refers to the Nuclear Regulatory Commission
(NRC)
inspection conducted by
G. F. Gibson on August 18 and 19,
1986.
The inspection included a review of
activities authorized for your Robinson facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas,
the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities appeared to violate NRC
requirements.
The violation, references to pertinent requirements, and elements
to be included in your response are described in the enclosed Notice of
Violation.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosures to
this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
8609190162 860912
ADOCK 05000261
)
SAFEG
.~~~~ INF RMATION
UrJ14
PA,
SAFEGU.
-'-
NF
i
)Cra
SAFEGUARD-S INFORMATION
,Carolina Power and Light Company
2
SrP 1 2 IQn
Should you have any questions concerning this letter, please contact us.
Sincerely,
Roger D. Walker, Director
Division of Reactor Projects
Enclosures:
(Safeguards Information)
2. NRC Inpsection Report
(Safeguards Information)
cc w/encls:
G. P. Beatty, Jr., Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
bcc w/encls:
File
NMSS/SGPL
NRR/DL/SSPB
bcc w/Inspection Summary:
Document Control Desk, 016
NRC Resident Inspector
State of South Carolina
RIIi
RIIEZRI&
GGibson:er
k
uire
.K a.+
J ohr
09<5/86
0943/86
09/12/86
094.,/86
. RII
/
RH
RII
LMe len
PF rdrickson
DV
relli
ENCLOSURE CONTAINS
PV/d86
09/1e86
i//86
SAIEGUARDS INFORMATION
UPONSEPARATIONTHIS
l
NPAGFE
IS DECONTROLLED.
SAFEGUARDS INFORMATION