ML14175B405

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/86-16 on 860609-13.No Violation or Deviation Noted.Attention to Unresolved Item Identified in Rept Invited
ML14175B405
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/11/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML14175B406 List:
References
NUDOCS 8608110114
Download: ML14175B405 (2)


See also: IR 05000261/1986016

Text

JUL 1109

6

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

vATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/86-16

This refers to the Nuclear Regulatory Commission (NRC)

inspection conducted by

G. R . Wiseman on June 9-13,

1986.

The inspection included a review of

activities authorized for your H. B. Robinson facility.

At the conclusion of

the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas,

the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Your attention is invited to unresolved item identified in the inspection report.

This matter will be pursued during future inspections.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

/2//

W10811014 860711

David M. Verrelli, Chief

PDO1ADOCK 0500

2DR

Reactor Projects Branch 2

a

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/encl:

(See page 2)

Carolina Power and Light Company

2JUL

L6

cc w/encl:

P. Beatty, Jr., Manager

Robinson Nuclear Project Department

E. Morgan, Plant General Manager

bcc w/encl:

IRRC Resident Inspector

Document Control Desk

State of South Carolina

RII

RII

RII

GRWiseman:er

T

0nlon

Aerdt

08/c /86

O/oj/86

0/q /86