Forwards Insp Rept 50-261/86-11 on 860428-0502.No Violations or Deviations Noted
ML14175B395
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 07/07/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML14175B396 List:
References
NUDOCS 8607180344
Download: ML14175B395 (2)


See also: IR 05000261/1986011

Text

July 7,

1986

Docket No. 50-261

License No. DPR-23

Carolina Power and Light Company

LATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NO. 50-261/86-11

This refers to the Nuclear Regulatory Commission (NRC)

inspection conducted by

F. R. McCoy on April 28 - May 2, 1986.

The inspection included a review of

activities authorized for your H. B. Robinson facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas,

the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(original signed by)

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

NRC Inspection Report

cc w/encl: (See page 2)

8607180344 860707

PDR

ADOCK 05000261

G

PDR

Carolina Power and Light Company

2

July 7, 1986

cc w/encl:

v6. P. Beatty, Jr., Manager

Robinson Nuclear Project Department

t'R. E. Morgan, Plant General Manager

bpc w/encl:

WRC Resident Inspector

Document Control Desk

State of South Carolina

RI

RI

i

RI

RH

FMcCoy:er

B

C ian

06//9/86

06/4o/ 6

6 786

RII

WPoertner

6/'&Q/86