ML14175B373

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/86-10 on 860411-0510.No Violation or Deviation Noted
ML14175B373
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/15/1986
From: Verrelli D
NRC/IE, NRC/RGN-II
To: Utley E
Carolina Power & Light Co
Shared Package
ML14175B374 List:
References
NUDOCS 8605200267
Download: ML14175B373 (1)


See also: IR 05000261/1986010

Text

MAY 1 5 1986

Carolin Power and Light Company

ATTN: ;r. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: REPORT NO. 50-261/86-10

On April 11 - May 10, 1986, NRC inspected activities authorized by NRC Operating

License No.

DPR-23 for your H. B. Robinson facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff identi

fied in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIGFD

DAVID M. VyERRLU

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-261/86-10

k w/encl:

G. P. Beatty, Jr., Manager

/Robinson

Nuclear Project Department

R. E. Morgan, Plant General Manager

Pcc w/encl:

vDocument Control Desk

tate of North Carolina

RC Resid

t Inspector

RH

JMellen:cdg

PFre

ickson

5/JL /86

05/( /86

6605200267 860515

PDR ADOCK 05000261

G

PDR