MAY 1 5 1986
Carolin Power and Light Company
ATTN: ;r. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT: REPORT NO. 50-261/86-10
On April 11 - May 10, 1986, NRC inspected activities authorized by NRC Operating
License No.
DPR-23 for your H. B. Robinson facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff identi
fied in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ORIGINAL SIGFD
DAVID M. VyERRLU
David M. Verrelli, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-261/86-10
k w/encl:
G. P. Beatty, Jr., Manager
/Robinson
Nuclear Project Department
R. E. Morgan, Plant General Manager
Pcc w/encl:
vDocument Control Desk
tate of North Carolina
RC Resid
t Inspector
RH
JMellen:cdg
PFre
ickson
5/JL /86
05/( /86
6605200267 860515
PDR ADOCK 05000261
G