ML14175B370

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/86-08 on 860316-21.No Violations or Deviations Noted
ML14175B370
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/22/1986
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML14175B371 List:
References
NUDOCS 8605070056
Download: ML14175B370 (2)


See also: IR 05000261/1986008

Text

APR 2 2 1986

/arolina Power and Light Company

vATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

REPORT NO. 50-261/86-08

On March 16-21,

1986,

NRC inspected activities authorized by NRC Operating

License Nos.

DPR-23 for your H. B. Robinson facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas,

the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-261/86-08

cc w/encl:

P. Beatty, Jr., Manager

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager

(bcc w/encl:

See page 2)

8605070056 860422

PD0 Dc 050002614

PDR

Carolina Power and Light Company

2

APR 2 21986

cc w/encl:

RC Resident Inspector

Document Control Desk

State of South Carolina

I

RII

RIO

JL athis:jw

Long

FJaV

ARHerdt

4/tA/86

4/ ft/86

4/ 786

4/\\%/86