ML14175B370
| ML14175B370 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 04/22/1986 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14175B371 | List: |
| References | |
| NUDOCS 8605070056 | |
| Download: ML14175B370 (2) | |
See also: IR 05000261/1986008
Text
APR 2 2 1986
/arolina Power and Light Company
vATTN: Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT:
REPORT NO. 50-261/86-08
On March 16-21,
1986,
NRC inspected activities authorized by NRC Operating
License Nos.
DPR-23 for your H. B. Robinson facility.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas,
the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-261/86-08
cc w/encl:
P. Beatty, Jr., Manager
Robinson Nuclear Project Department
R. E. Morgan, Plant General Manager
(bcc w/encl:
See page 2)
8605070056 860422
PD0 Dc 050002614
Carolina Power and Light Company
2
APR 2 21986
cc w/encl:
RC Resident Inspector
Document Control Desk
State of South Carolina
I
RII
RIO
JL athis:jw
Long
FJaV
ARHerdt
4/tA/86
4/ ft/86
4/ 786
4/\\%/86