Forwards Insp Rept 50-261/86-05 on 860211-0310.No Violations or Deviations Noted
ML14175B367
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/24/1986
From: Panciera V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML14175B368 List:
References
NUDOCS 8604020343
Download: ML14175B367 (1)


See also: IR 05000261/1986005

Text

MAAR 2 4

arolina Power and Light Company

.,ATTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: REPORT NO. 50-261r 0

On February 11 -

March 10,

1986,

NRC inspected activities authorized by NRC

Operating License No. DPR-23 for your H. B. Robinson facility. At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas,

the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviaticns were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Vincent W. Panciera, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-261/86-05

Ic w/encl:

G. P. Beatty, Jr., Manager

Robinson Nuclear Project Department

JR. E. Morgan, Plant General Manager

bcc w/encl:

Document Control Desk

tate of North Carolina

\\NRC Resident Inspector

PF4ed ckson

03/24/86

03/7//86

6604020343 860324

PDR

ADOCK 05000261

G

PDR