ML14175B344
| ML14175B344 | |
| Person / Time | |
|---|---|
| Site: | Robinson |
| Issue date: | 12/18/1985 |
| From: | Verrelli D NRC/IE, NRC/RGN-II |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML14175B345 | List: |
| References | |
| NUDOCS 8512300142 | |
| Download: ML14175B344 (1) | |
See also: IR 05000261/1985034
Text
DEC 18 1985
Carolina Power and Light Company
iAfTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT: REPORT NO. 50-261 5
On November 11 -
December 10,
1985,
NRC inspected activities authorized by NRC
Operating License No. DPR-23 for your H. B. Robinson facility. At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas,
the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-261/85-34
cc w/encl:
v4. P. Beatty, Jr., Manager
Robinson Nuclear Project Department
v<. E. Morgan, Plant General Manager
bcc w/encl:
"4RC
Resident Inspector
Document Control Desk
State of South Carolina
8512300142 851218
0.
ADOCK 05000261
RII
RI
,
IMellen:jw
P elrickson
12/If/85
12/t%/85