NOV 15 1985
Carolina Power and Light Company
VIATTN: Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC
27602
Gentlemen:
SUBJECT: REPORT NO. 50-26183
On October 11 -
November 10,
1985,
NRC inspected activities authorized by NRC
Operating License No. DPR-23 for your H. B. Robinson facility. At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas,
the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
'ORIGINAL SIGNED BY
DAVID M. VERRELU
David M. Verrelli
Chief, Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-261/85-31
ic w/encl:
VG.
P. Beatty, Jr., Manager
Robinson Nuclear Project Department
lA. E. Morgan, Plant General Manager
bcc w/encl:
LANRC Resident Inspector
Document Control Desk
State of South Carolina
K ug
PFre
ickson
DMVe elli
16
/85
11/6785
11/
5
8512060413 851115
PDR ADOCK 05000261
G