ML14175B334

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/85-30 on 850916-20.No Violation Noted
ML14175B334
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/04/1985
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Utley E
Carolina Power & Light Co
Shared Package
ML14175B335 List:
References
NUDOCS 8510220107
Download: ML14175B334 (1)


See also: IR 05000261/1985030

Text

OCT 4 1985

O

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT:

REPORT NO. 50-261/Q

On September 16-20, 1985, NRC inspected activities authorized by NRC Operating

License No.

DPR-23 for your Robinson facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within these

areas,

the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-261/85-30

cc w/encl:

vG. P. Beatty, Jr., Manager

Robinson Nuclear Project Department

OR. E. Morgan, Plant General Manager

cc w/encl:

VNRC Resident Inspector

Document Control Desk

State of South Carolina

WRoss:dr

lake

AHerdt

8510220107 851004

PDR

ADOCK 05000261

0

PDR