OCT 1 0 1985
Carolina Power and Light Company
ATTN:
Mr. E. E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0. Box 1551
Raleigh, NC 27602
Gentlemen:
SUBJECT: REPORT NO. 50-261/85-28
On September 11 - October 10,
1985,
NRC inspected activities authorized by NRC
Operating License No. .DPR-23 for your H. B. Robinson facility. At the conclusion
of the inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas,
the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
.
Should you have any questions concerning this letter, please contact us.
Sincerely,
[
David M. Verrelli
"
Chief, Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
Inspection Report No. 50-261/85-28
yc w/encl:
G. P. Beatty, Jr., Manager,
z Robinson Nuclear Project Department
VR. E. Morgan, Plant General Manager
bcc w/encl:
Document Control Desk
State of North Carolina
V4KRC Resident Inspector
RI
RH
HK g
PFre
kc
10/1(7/85
10/1a /85
8510Oi30431 851010
0