Forwards Insp Rept 50-261/85-28 on 850911-1010.No Violation or Deviation Noted
ML14175B331
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 10/10/1985
From: Verrelli D
NRC/IE, NRC/RGN-II
To: Utley E
Carolina Power & Light Co
Shared Package
ML14175B332 List:
References
NUDOCS 8510180431
Download: ML14175B331 (1)


See also: IR 05000261/1985028

Text

OCT 1 0 1985

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. 0. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: REPORT NO. 50-261/85-28

On September 11 - October 10,

1985,

NRC inspected activities authorized by NRC

Operating License No. .DPR-23 for your H. B. Robinson facility. At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas,

the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Within the scope of the inspection, no violations or deviations were identified.

.

Should you have any questions concerning this letter, please contact us.

Sincerely,

[

David M. Verrelli

"

Chief, Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-261/85-28

yc w/encl:

G. P. Beatty, Jr., Manager,

z Robinson Nuclear Project Department

VR. E. Morgan, Plant General Manager