ML14175B314

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/85-23 on 850711-0810.No Violations or Deviations Noted
ML14175B314
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 08/13/1985
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML14175B315 List:
References
NUDOCS 8508290284
Download: ML14175B314 (1)


See also: IR 05000261/1985023

Text

AUG 13 1985

.

Carolina Power and Light Company

,ATTN: Mr. E. E. Utley

V

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

SUBJECT: REPORT NO. 50-261/5 3

On July 11 - August 10,

1985,

NRC inspected activities authorized by NRC

Operating License No.

DPR-23 for your H. B. Robinson facility. At the

conclusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records,

interviews with personnel,

and observation of

activities in progress.

Within the scope of the inspection,

no violations or deviations were

identified.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ORIGINAL SIGNFo By

DAVID M. VERRELLI

David M. Verrelli, Chief

Reactor Projects Branch 1

Division of Reactor Projects

Enclosure:

Inspection Report No. 50-261/85-23

w/encl:

G. P. Beatty, Jr., Manager

/obinson Nuclear Project Department

X. E. Morgan, General Plant Manager

bcc w/encl:

-NRC Resident Inspector

Document Control Desk

State of South Carolina

PDRSADOC

850813

R

G

05000261

PDR

rug

PFredrickson

8/\\'785

8/(V'/85

C-t

f

\\-)

/