Forwards Insp Rept 50-261/85-11 on 850211-0310 & Notice of Violation.Response Should Address Improvements to Mod Program Ensuring All Changes to safety-related Structures, Sys & Components Performed.W/O Notice of Violation
ML14175B274
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/11/1985
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML14175B276 List:
References
NUDOCS 8506270896
Download: ML14175B274 (2)


See also: IR 05000211/2003010

Text

APRi1l 1985

Carolina Power and Light Company

ATTN:

Mr. E. E. Utley

Executive Vice President

Power Supply and Engineering

and Construction

411 Fayetteville Street

Raleigh, NC

27602

Gentlemen:

SUBJECT:

REPORT NO. 50-261 5

L)

On February 11 -

March 10,

1985,

NRC inspected activities authorized by NRC

Operating License No. DPR-23 for your H. B. Robinson facility. At the conclusion

of the inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report.

Within these

areas,

the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

. The inspection findings indicate that certain activities violated NRC require

ments. The violations, references to pertinent requirements, and elements to be

included in your response are presented in the enclosed Notice of Violation.

In addition to your response to the violation identified in Enclosure 1, please

address the improvements to your modification program that will insure that all

changes to safety-related structures, systems and components are performed using

appropriate design change measures

as specified in

10

CFR 50 Appendix B,

Criterion III, receive safety reviews as required by the Robinson Technical

Specifications and 10 CFR 50.59 and are not placed into service until these

requirements are adequately met. Your response should, as a minimum,

discuss

the use of the Engineering Evaluation and Temporary Repair Procedure systems used

to meet the above requirements.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

J. Nelson Grace

Regional Administrator

Enclosures: (See page 2)

8506270896 850411

PDR ADOCK 05000261

0PDR

jC

J~, 0

Carolina Power and Light Company

2

APR 11 1985

Enclosures:

1. Notice of Violation

2.

Inspection Report No. 50-261/85-11

cc w/encls:

G. P. Beatty, Jr., Manager

Robinson Nuclear Project Department

R. E. Morgan, Plant General Manager

bcc w/encls:

(See page 2)

bcc w/encls:

NRC Resident Inspector

Document Control Desk

State of North Carolina

RII

R

RII

RH

RI

dinsa

P edricko

dinasa

P

ickson

DVerrelli

flARWalker

J

inski

04/J /8 5

04/ /85

04/q /85

04/1 /85

0

in/85