ML14175B271

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-261/80-39 on 801223-31 & Notice of Violation
ML14175B271
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/18/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML14175B269 List:
References
NUDOCS 8105060183
Download: ML14175B271 (2)


See also: IR 05000261/1980039

Text

epRREG(,

0

UNITED STATES

f

aNUCLEAR

REGULATORY COMMISSION

REGION Il

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

MAR1 8 1981

Carolina Power and Light Company

ATTN:

J. A. Jones, Senior Executive

Vice President and Chief

Operating Officer

411 Fayetteville Street

Raleigh, NC

27602

Gentlemen:

Subject:

Report No. 50-261/80-39

This refers to the routine safety inspection conducted by T. J. Donat of this

office on December 23-31,

1980, of activities authorized by NRC Operating License

No.

DPR-23 for the H. B. Robinson facility.

Our preliminary findings were

discussed with R. Starkey at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. These items and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A. Elements to be included in your response are delineated in

Appendix A.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items.

The status of these items is discussed

in the enclosed report.

In accordance with Section 2.790 of the NRC "Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspec

tion report will be placed in the NRC Public Document Room.

If this report

contains any information that you believe to be proprietary, it is necessary that

you make a written application. within 20 days to this office to withhold such

information from public disclosure. Any such application must include the basis

for claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document. If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

0

-3

MARI

18

Carolina Power and Light Company

2

Should.you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

,gc

R. C.

s,.Acting Director

Divis on of Resident and

Reactor Project Inspection

Enclosures:

1. Appendix A, Notice of Violation

2.

Inspection- Report No. 50-261/80-39

cc w/encl:

R. B. Starkey, Jr., Plant Manager