Forwards IE Insp Rept 50-261/80-35 on 801027-31.No Noncompliance Noted
ML14175B243
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 11/28/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML14175B244 List:
References
NUDOCS 8101100823
Download: ML14175B243 (2)


See also: IR 05000261/1980035

Text

B REGj,

Eo

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION il

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

In Reply Refer To:

NOY 2 b

Carolina Power and Light Company

ATTN:

J. A. Jones

Senior Executive Vice President and

Chief Operating Officer

411 Fayetteville Street

Raleigh, NC

27602

Gentlemen:

This refers to the inspection conducted by E.

H.

Brooks of this office on

October 27-31, 1980,

of activities authorized by NRC Operating License No.

DPR-23 for the H.

B. Robinson facility, and to the discussion of our findings

held with R. B. Starkey at the conclusion of the inspection.

Areas

examined during the inspection and our findings are discussed in

the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In

accordance with Section 2.790 of the NRC's "Rules of Practice",

Part 2,

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it

is

claimed that the information is

proprietary, and should be prepared so

that proprietary information identified in

the application is

contained in

a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

Richard'C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support Branch

Enclosure:

(See Page 2)

810 110 0 91

Carolina Power and Light Company

-2-

NOV 2 8 1go

Enclosure:

Inspection Report No. 50-261/80-35

cc w/encl:

R. B. Starkey, Jr., Plant Manager