Text
In Repl
REferTo
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
OCT 27 1980
In Reply Refer To:
RII:WHM
50-261/80-26
Carolina Power and Light Company
ATTN:
J. A. Jones
Senior Executive Vice President and
Chief Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
This refers to the inspection conducted by W. H. Miller, Jr. of this office on
September 29 through October 2, 1980, of activities authorized by NRC Operating
License No.
DPR-23 for the Robinson facility, and to the discussion of our
findings held with R. B. Starkey at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas,
the inspection consisted of
selective examinations of procedures and representative records, interviews with
- personnel, and observations by the inspector.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolved items.
The status of these items is discussed
in the enclosed report.
Three new unresolved items resulted from this inspection and are discussed in
the enclosed report.
These items will be examined during subsequent inspections.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements.
These items and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal Regula
tions.
Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
Wapplication must include a full statement of the reasons on the basis of which
a (R213 0 137
Carolina Power and Light Company
-2-
.l
r 1980
it
is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in
the application is
contained in
a
separate part of the document. 'If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
C. E. Murphy, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-261/80-26
cc w/encl:
R. B. Starkey, Jr., Plant Manager